S5 Geography Practice Paper: Population Structure and Transition, River Landforms and Flood Management, Coastal Landforms and Sea-Level Rise, Urban Land Use and Urban Problems, Industrial Location and Manufacturing Shift, Agricultural Systems and the Energy Mix (100 marks)

S5 Geography Practice Paper: Population Structure and Transition, River Landforms and Flood Management, Coastal Landforms and Sea-Level Rise, Urban Land Use and Urban Problems, Industrial Location and Manufacturing Shift, Agricultural Systems and the Energy Mix (100 marks)

  • 2026-11-21

Geography · S5

S5 Geography practice paper: 24 questions on population structure, river floods, coastal erosion, urban land use, industrial location, farming and the energy mix, with full.

Paper details S5 Geography practice paper: 24 questions, 100 marks, full mark schemes.

Part A: Population Structure and Transition (17 marks)

Each question carries 4-5 marks; show the formula and units, then state the result in one sentence.

# Question Answer and marking notes
1 District A has an area of 78 km2 and a population of 486,000. Calculate its population density in persons per km2 (1 d.p.). 486,000 / 78 = 6,230.8 persons per km2. Marks: formula 1, substitution 1, answer with unit 1, one-sentence comment (a densely populated urban district) 1.
2 In the same year there were 5,832 births and 3,402 deaths with a mid-year population of 486,000. Calculate the rate of natural increase (per 1,000, 1 d.p.) and identify the stage of demographic transition. (5,832 – 3,402) / 486,000 x 1,000 = 5.0 per 1,000; this is the low-growth stage (stage 3 to 4) with both birth and death rates low. Marks: formula 1, substitution and unit 1, answer 5.0 per 1,000 1, identification of stage 1.
3 Age structure: 68,040 aged 0-14, 330,480 aged 15-64 and 87,480 aged 65 or above. Calculate the young dependency ratio, the old dependency ratio and the total dependency ratio (1 d.p. each). Young: 68,040 / 330,480 x 100 = 20.6%; old: 87,480 / 330,480 x 100 = 26.5%; total: 155,520 / 330,480 x 100 = 47.1%. Marks: 1 for each ratio (formula or answer), plus 2 for using the working-age population as the denominator.
4 Using the data above, identify the shape of the population pyramid and state two corresponding socio-economic characteristics. Contractive (ageing) pyramid: a narrow base with a relatively wide top. Characteristics (any two): persistently low birth rate, long life expectancy, rising old-age dependency, shrinking workforce, higher health-care and pension spending. Marks: shape 2, 1 per characteristic.

Part B: River Landforms and Flood Management (17 marks)

Show units in all calculations; explanations must give causal links, not a list of features.

# Question Answer and marking notes
5 A catchment covers 620 km2 with annual rainfall of 2,400 mm and a runoff coefficient of 0.45. Calculate the annual runoff volume in m3 (3 significant figures). 620 km2 = 620 x 10^6 m2; 2,400 mm = 2.4 m. 620 x 10^6 x 2.4 x 0.45 = 6.70 x 10^8 m3. Marks: area conversion 1, depth conversion 1, calculation 1, answer with significant figures 1.
6 180 mm of rain falls in 24 hours over the same catchment. Calculate the mean discharge for that day in m3/s (whole number) and explain why the actual peak discharge is higher than the mean. 180 mm = 0.18 m; 620 x 10^6 x 0.18 x 0.45 = 5.02 x 10^7 m3; divided by 86,400 s = 581 m3/s. Reasons: rain concentrated in a few hours, tributary peaks arriving together, limited soil and channel storage, urbanisation raising the runoff coefficient. Marks: calculation 3, explanation 2.
7 The designed channel capacity is 600 m3/s with a return period of 50 years. Find the probability that this discharge occurs at least once in 50 years (%, 1 d.p.). 1 – (1 – 1/50)^50 = 63.6%. Marks: formula 2, calculation 1, answer with % sign 1.
8 Compare the mean discharge with the channel capacity, identify the flood risk, and suggest two flood-management measures with one limitation each. The mean discharge of 581 m3/s is already close to the 600 m3/s capacity, and the peak factor will certainly exceed it, so flood risk is high. Measures and limitations (any two): dredging or widening the channel (expensive, may raise water levels upstream); flood storage ponds (need large areas of land); embankments (risk of breaching, may worsen downstream flooding); land-use planning (restricts development, strong opposition). Marks: risk 2, 1 per measure with limitation.

Part C: Coastal Landforms and Sea-Level Rise (16 marks)

Each question carries 4 marks; support every judgement with the data given.

# Question Answer and marking notes
9 Longshore drift moves 45,000 m3 of sediment per year. After a sea wall is built the downdrift beach loses the same volume each year and currently holds 135,000 m3. How many years until the beach disappears? 135,000 / 45,000 = 3 years. Marks: formula 2, answer with unit 1, identifying the sea wall blocking drift as the cause 1.
10 Sea level rises by 4.2 mm per year. How much will it rise in total after 30 years, in cm? 4.2 x 30 = 126 mm = 12.6 cm. Marks: calculation 2, unit conversion 1, answer 1.
11 The coast retreats at 1.8 m per year and a building stands 45 m from the shoreline. After how many years will the sea reach the building? Give one factor that makes this estimate too low. 45 / 1.8 = 25 years. Factors (any one): storm surges and typhoons intensify erosion, dams upstream cut sediment supply, accelerating sea-level rise, land subsidence from groundwater extraction. Marks: calculation 2, factor 2.
12 Option 1: build a 1.2 km sea wall at $38,000 per metre. Option 2: beach nourishment of 45,000 m3 at $180 per m3. Calculate both costs and give one advantage of each. Sea wall: 1,200 x $38,000 = $45,600,000; nourishment: 45,000 x $180 = $8,100,000. The wall is durable and protects the hinterland directly; nourishment is cheaper and keeps the beach and its tourism value, though it must be repeated. Marks: 1 per cost, 1 per advantage.

Part D: Urban Land Use and Urban Problems (17 marks)

Give answers to 1 d.p.; evaluation questions need an explicit conclusion.

# Question Answer and marking notes
13 A city has 610,000 people in a built-up area of 50 km2, of which 42% is residential. Calculate the overall population density and the residential density (persons per km2, 1 d.p.). Overall: 610,000 / 50 = 12,200 per km2; residential land = 50 x 0.42 = 21 km2, so 610,000 / 21 = 29,047.6 per km2. Marks: overall 2; residential 3 (area, division, answer).
14 Land use shares: residential 42%, commercial 9%, industrial 6%, roads 18%, open space 8%, others 17%. Verify that the total is 100% and identify the use most likely to occupy the city centre, with a reason. 42 + 9 + 6 + 18 + 8 + 17 = 100%. Commercial use is most likely in the centre: it has the highest accessibility, the greatest ability to bid for rent and needs to be close to large numbers of people. Marks: total 2, use 1, reason 1.
15 Commuters travel 12.4 km each way on average and work 240 days a year. Calculate the total distance each commuter travels per year in km. 12.4 x 2 x 240 = 5,952 km. Marks: return trip (x2) 1, calculation 2, answer with unit 1.
16 Open space covers 4.0 km2 of the 50 km2 built-up area for 610,000 people, against a standard of 2 m2 per person. Calculate the share of open space and the actual open space per person, then judge whether the standard is met. Open space share: 4.0 / 50 x 100 = 8%; per person: 4.0 x 10^6 / 610,000 = 6.6 m2. Since 6.6 > 2 the standard is met in quantity, but provision is unevenly distributed and older districts may still fall short. Marks: share 1, per person 2, judgement 1.

Part E: Industrial Location and Manufacturing Shift (16 marks)

Keep all costs and profits for the same period (per month); comparison questions need a clear verdict.

# Question Answer and marking notes
17 A factory of 1,800 m2 rents at $28 per m2 per month and employs 120 workers at $16,500 per month. Calculate the monthly rent and total wage bill. Rent: 1,800 x $28 = $50,400; wages: 120 x $16,500 = $1,980,000. Marks: rent 1, wages 2, units 1.
18 Monthly revenue is $6,200,000 and materials plus transport cost $3,600,000, on top of the rent and wages above. Calculate the monthly profit and the profit margin (%, 1 d.p.). Total cost: 3,600,000 + 1,980,000 + 50,400 = $5,630,400; profit: 6,200,000 – 5,630,400 = $569,600; margin: 569,600 / 6,200,000 x 100 = 9.2%. Marks: total cost 2, profit 1, margin 2.
19 The firm considers relocating: wages fall 35% but materials and transport rise 18% (rent unchanged). Calculate the new monthly total cost and judge whether relocation is worthwhile. Wages: 1,980,000 x 0.65 = $1,287,000; materials and transport: 3,600,000 x 1.18 = $4,248,000; new total: 1,287,000 + 4,248,000 + 50,400 = $5,585,400, which is $45,000 less. Relocation is worthwhile but the saving is small (about 0.8%), so lead time, supply-chain reliability and moving costs must also be weighed. Marks: 1 per new cost, total 1, judgement with reason 1.
20 Fixed costs are $1,200,000 per month, the unit price is $240 and unit variable cost is $165. Calculate the break-even output in units. 1,200,000 / (240 – 165) = 1,200,000 / 75 = 16,000 units. Marks: unit contribution 1, formula 1, answer 1.

Part F: Agricultural Systems and the Energy Mix (17 marks)

Give units with every calculated answer; justify every suggestion.

# Question Answer and marking notes
21 A farm has 320 hectares of farmland and produces 1,920 tonnes of rice a year. Calculate the yield in tonnes per hectare. 1,920 / 320 = 6.0 tonnes per hectare. Marks: formula 2, answer with unit 2.
22 Local food output is 15,600 tonnes against total demand of 104,000 tonnes. Calculate the food self-sufficiency rate (%). 15,600 / 104,000 x 100 = 15.0%. Marks: formula 2, calculation 1, answer 1.
23 Energy mix: coal 38%, natural gas 26%, nuclear 15%, renewables 21%, with total generation of 42,000 GWh. Verify the percentages and calculate renewable generation in GWh. 38 + 26 + 15 + 21 = 100%; 42,000 x 0.21 = 8,820 GWh. Marks: verification 2, calculation 2, answer with unit 1.
24 Annual generation emits 26.4 Mt of CO2 for 42,000 GWh. Calculate the carbon intensity in g CO2/kWh and suggest two ways to cut emissions. 26.4 x 10^9 kg / 42 x 10^9 kWh = 0.629 kg/kWh = 629 g CO2/kWh. Methods (any two): raise the renewable share, retire coal units, improve plant and grid efficiency, demand-side management and energy saving. Marks: calculation 2, 1 per method.

Find a tutor — freeTutor Registration →

A TutorZone practice paper; original questions and passages, not publisher material.

Join as a tutor or coach — academic, music, sports, arts, STEM. Free to register. See how it works →