/en-s5-geography-river-runoff-coast-wave-energy-lapse-rate-humidity-earthquake-farming-urban-industry-practice-paper/
/en-s5-geography-river-runoff-coast-wave-energy-lapse-rate-humidity-earthquake-farming-urban-industry-practice-paper/
General Inquiry: info@TutorZone.com.hk
Office Hours: Monday to Saturday - 9:00 AM to 6:00 PM
WhatsApp Monday to Sunday - 24 hours
Hotline: +852 6828 1809
Instant Support: +852 9061 3106

S5 Geography Practice Paper (Set 3): River Discharge and Runoff Coefficient, Coastal Erosion and Wave Energy, Lapse Rate and Relative Humidity, Plate Tectonics and Earthquakes, Agricultural Output and Food Self-sufficiency, Urban Density and Industrial Location

S5 Geography Practice Paper (Set 3): River Discharge and Runoff Coefficient, Coastal Erosion and Wave Energy, Lapse Rate and Relative Humidity, Plate Tectonics and Earthquakes, Agricultural Output and Food Self-sufficiency, Urban Density and Industrial Location

  • 2026-11-22

Geography · S5

S5 Geography paper: 24 parts, 100 marks, 75 min on runoff, coasts, climate, earthquakes, farming and urban sites.

Paper details S5 Geography practice paper: runoff and peak discharge, wave energy, lapse rate and humidity, earthquakes, rice yield and urban density

Section A: River Discharge and Runoff Coefficient (16 marks)

Show the formula and full working; give answers to 3 significant figures with units.

# Question Answer and marking notes
1 A catchment of 120 km^2 receives 80 mm of rain in six hours. The runoff coefficient is 0.45. Find the total runoff volume in m^3. Runoff = 0.45 x 0.080 m x 120.0 x 10^6 m^2 = 4.32 x 10^6 m^3.
2 Assuming all runoff leaves within the six hours, find the mean peak discharge. Q = 4.32 x 10^6 m^3 / (6 x 3600 s) = 200 m^3/s.
3 The channel is 40 m wide with mean depth 2.5 m and mean velocity 1.2 m/s. Find its capacity. Q = 40 x 2.5 x 1.2 = 120 m^3/s.
4 Compare the two results: by what percentage does the peak exceed the channel capacity? State one urban planning measure that reduces peak flow. Excess = (200 – 120) / 120 x 100% = 66.7%, about 1.7 times. Measure: permeable surfaces, detention ponds or green belts cut surface runoff.

Section B: Coastal Erosion and Wave Energy (16 marks)

Wave energy density E = rho*g*H^2/8 with rho = 1000 kg/m^3 and g = 9.81 m/s^2.

# Question Answer and marking notes
5 For waves of height 1.5 m, find the wave energy density in J/m^2. E = 1000 x 9.81 x 1.5^2 / 8 = 2759 J/m^2 (about 2.76 kJ/m^2).
6 Water depth is 8 m. Find the shallow water wave speed c = sqrt(g*d). c = sqrt(9.81 x 8) = 8.86 m/s.
7 Longshore drift carries 45000 m^3 of sediment a year along 1200 m of coast. Find the drift per metre per year. Per metre = 45000 / 1200 = 37.5 m^3/m/yr.
8 A seawall costs $8500 per metre. Find the total cost for the whole frontage and state one side effect of seawalls. Total = 8500 x 1200 = $10.2 x 10^6 (about $10.2 million). Side effect: wave reflection scours the toe, or reduced sediment supply speeds erosion downdrift.

Section C: Lapse Rate and Relative Humidity (16 marks)

Environmental lapse rate 6.5 deg C per km; vapour pressures in hPa.

# Question Answer and marking notes
9 The foot of a hill is at 28 deg C; the summit is 1800 m higher. Find the summit temperature. Drop = 6.5 x 1.8 = 11.7 deg C; summit = 28 – 11.7 = 16.3 deg C.
10 At 25 deg C the saturation vapour pressure is 31.7 hPa and the actual vapour pressure is 21.0 hPa. Find the relative humidity. RH = 21.0 / 31.7 x 100% = 66.25%.
11 Using Td = 243.5 ln(e/6.112) / (17.67 – ln(e/6.112)), estimate the dew point. ln(21.0/6.112) = 1.2343; Td = 243.5 x 1.2343 / (17.67 – 1.2343) = 18.3 deg C.
12 A catchment of 250 km^2 receives 95 mm of rain. Find the volume of rain falling on it. Volume = 250.0 x 10^6 m^2 x 0.095 m = 2.38 x 10^7 m^3.

Section D: Plate Tectonics and Earthquakes (16 marks)

P waves travel at 6.0 km/s and S waves at 3.5 km/s; log10(E) = 4.8 + 1.5M.

# Question Answer and marking notes
13 P and S waves from an earthquake arrive 24 s apart. Find the epicentral distance. d = 24 / (1/3.5 – 1/6.0) = 201.6 km.
14 How much energy does a magnitude 5.5 earthquake release? logE = 4.8 + 1.5 x 5.5 = 13.05; E = 10^13.05 = 1.12 x 10^13 J.
15 How many times more energy does a magnitude 6.5 event release than a magnitude 5.5 event? Ratio = 10^(1.5 x (6.5 – 5.5)) = 10^1.5 = 31.6 times.
16 A plate moves 7 cm a year. How long does it take to accumulate 500 km of displacement? Time = 5 x 10^5 m / 0.07 m per year = 7.14 x 10^6 years (about 7.1 million years).

Section E: Agricultural Output and Food Self-sufficiency (18 marks)

Yield is in tonnes per hectare (t/ha); 1 hectare = 10,000 m^2.

# Question Answer and marking notes
17 Farmland covers 12000 ha with average rice yield 5.4 t/ha. Find total production. Production = 12000 x 5.4 = 64800 tonnes.
18 Annual rice demand is 78000 tonnes. Find the food self-sufficiency rate. Self-sufficiency = 64800 / 78000 x 100% = 83.1%.
19 Fertiliser is applied at 180 kg/ha at $4.2 per kg. Find the total fertiliser bill in $ million. Use = 12000 x 180 / 1000 = 2160 tonnes; cost = 2160 x 10^3 kg x $4.2 = $9.07 million.
20 Irrigation supplies 1,100 mm a year. Find the total water volume in m^3 and state one way to raise water efficiency. Volume = 12000 x 10^4 m^2 x 1.1 m = 1.32 x 10^8 m^3. Method: drip or demand-based irrigation cuts evaporation and seepage losses.

Section F: Urban Density and Industrial Location (18 marks)

Compare land rent plus transport cost; give totals in $ million.

# Question Answer and marking notes
21 A city has 486000 people over 32 km^2. Find the population density. Density = 486000 / 32 = 15188 people per km^2.
22 Land use is 45% residential, 12% industrial, 15% roads and 28% green space. Find the industrial and green areas in km^2. Industrial = 0.12 x 32 = 3.84 km^2; green = 0.28 x 32 = 8.96 km^2.
23 A firm compares two sites: A rents at $95/m^2 with transport $12 per unit; B rents at $62/m^2 with transport $21 per unit. Each site is 20000 m^2 and output is 180000 units a year. Find both total costs and the better site. A = 95 x 20000 + 12 x 180000 = $4.06 million; B = 62 x 20000 + 21 x 180000 = $5.02 million; A is cheaper by $0.96 million, so choose A.
24 Labour is 35% of total cost and wages rise 18%. By what percentage does unit cost rise? Rise = 0.35 x 18% = 6.3%.

Find a tutor — freeTutor Registration →

A TutorZone practice paper; original questions and passages, not publisher material.

Join as a tutor or coach — academic, music, sports, arts, STEM. Free to register. See how it works →