IB Geography Option D: Tutor Prep Guide (Hazard Risk, Resilience, Adaptation)
- 2026-11-28
The same earthquake is a news item in one place and a catastrophe in another. This lesson breaks risk into three multipliers, turns it into a probability and a bill, then sorts the management options into before and after, asking which multiplier each one actually lowers.
01 Prerequisites (3-minute check)
If any of these fails, fix it before the lesson starts.
| Skill | Quick check | Pass mark |
|---|---|---|
| Multiplying proportions | 0.8 times 0.6 | 0.48 |
| Probability | How to find the chance of at least one event in fifty years at 1 per cent a year | One minus 0.99 to the fiftieth power |
| GDP share | How to express a loss as a share of GDP | Loss divided by GDP times a hundred |
| Before and after | Which measures happen before an event | Zoning, retrofitting, insurance and warning are all pre-event |
02 Lesson flow (60 minutes)
| Time | Stage | Tutor does | Student does |
|---|---|---|---|
| 0-8 min | Opening probe | Ask why one earthquake kills ten times more in one place | Write answers, compare at the end |
| 8-22 min | Act one: three multipliers and four factor groups | 0.48 against 0.06, a factor of 8 | Fill a risk table for each place |
| 22-34 min | Act two: return periods, loss and insurance | 39.5 per cent in fifty years; 5.25 against 0.26 per cent | Compute probability and recovery burden |
| 34-48 min | Act three: measures before and after | Zoning moves 4,800; a wall cuts 66.7 per cent | Match each measure to a multiplier |
| 48-56 min | Trends and projections | Frequency rising as exposure grows | Write how risk will change |
| 56-60 min | Exit check | Collect three answers, mark at once | Independent work |
03 Teaching script (read it out)
Scene 1: Risk is not the hazard: three multipliers
Take two places. Place A has hazard 1 on the same fault, exposure 0.8 because people and assets are concentrated, and vulnerability 0.6 because buildings are unregulated and uninsured, giving risk 0.48. Place B has hazard 1, exposure 0.3 and vulnerability 0.2, giving 0.06, a difference of 8 times. Make the point explicit: the hazard is identical, so the whole difference sits in the last two multipliers, which is why a so-called natural disaster is often partly manufactured.
Now break vulnerability into four groups. Economic: development and technology decide how buildings and infrastructure perform. Social: education and gender affect whether warnings arrive, are understood and are acted on, and whether people can swim. Demographic: density and age structure decide how many are hurt by the same shaking. Political: governance decides whether codes are enforced and relief arrives. Ask for one example per group rather than the phrase poor countries suffer more.
Add geography: rural or urban siting, whether the event hits at night or in the day, and isolation. A night earthquake traps people in housing, a daytime one in schools and offices; a remote valley loses its road and becomes an island, which is what isolation means in practice.
Close with magnitude against frequency: large events are rare and small ones common, so design standards follow acceptable risk, not the largest conceivable event. The summary sentence: risk can be managed because two of the three multipliers are ours to change.
Student task: fill a three-row table of hazard, exposure and vulnerability for both places, compute the ratio, then name the single measure that would cut that place risk most.
Say this: “The hazard sets the ceiling; exposure and vulnerability decide who pays.”
Scene 2: Return periods, losses and insurance: pricing risk
Return period: one in a hundred years is 1 per cent in any year. The chance of at least one event in fifty years is 1 minus 0.99 to the fiftieth, 39.5 per cent, and in thirty years 26.0 per cent. Draw out what that does: it turns a distant rarity into a coin flip within one generation, which is why planning horizons use it rather than the date of the last event.
Loss and recovery: a 2.1 billion loss is 5.25 per cent of a 40 billion economy but 0.26 per cent of an 800 billion one, a factor of 20. Spell out the consequence: the smaller economy cuts other spending, borrows, and may take a decade to recover, while the larger one rebuilds within a year from reserves and insurance. Same disaster, different recovery, and the difference is economic scale.
Insurance transfers the risk. With penetration of 3 and 45 per cent, uninsured losses are 97 and 55 per cent. Name the limit: premiums are priced on risk, so the people who most need cover face the highest price, which is why governments run public schemes or buy reinsurance.
Then join the three layers: probability from the return period, expected loss as probability times loss, and financing through insurance, reserves and aid. That sequence is the skeleton of disaster risk financing and the easiest place to earn evaluation marks.
Student task: use 1 per cent for the thirty and fifty year chances, compute both GDP shares, then write one sentence on why insurance fails in the highest-risk districts.
Say this: “One in a hundred years is one per cent a year, and that is a 39.5 per cent chance in a lifetime of planning.”
Scene 3: Before and after: which multiplier does each measure move
Pre-event, cutting exposure: land use zoning. Reserving 0.4 square kilometres at 12,000 people per square kilometre moves 4,800 people out of the hazard zone. Name the difficulty: land has value, zoning restricts property rights, and the political resistance is the strongest of any measure here.
Pre-event, cutting vulnerability: building design and retrofit. Base isolation can cut acceleration by 65 per cent, a new build carries a premium near 8 per cent, and retrofitting an existing block costs about 25 per cent of rebuild cost. Compare them: the premium is cheap but most stock already exists, so retrofit is the main battleground.
Pre-event, softening the hazard: sea walls and breakwaters, cutting a 15 m run-up to 5 m, a reduction of 66.7 per cent, at high cost, with beach loss and the risk that an over-design event still overtops. Slope drainage, retaining walls and planting handle mass movement; volcanoes are watched with GPS and tiltmeters, where crater inflation of 5 cm in 3 months is grounds for raising the alert, and lava diversion depends on terrain and on how viscous the flow is.
Post-event: rescue, rehabilitation and reconstruction, where time dominates. Survival is about 90 per cent within 24 hours and falls to roughly 50 per cent by 72, so search and location technology is valued in hours. Communications do three jobs at once: mapping the disaster, locating survivors and coordinating supplies. Name the backlash: evacuating 20,000 people on a false alarm costing 2.4 million erodes trust, and too many false alarms mean nobody moves next time.
Close on trends: hazard frequency is rising with climate and exposure, population and assets keep concentrating in cities, and the two multiply. Adaptation is simply pushing each multiplier down.
Student task: list six measures, zoning, isolation, sea walls, slope works, volcano monitoring and warning, and give each the multiplier it lowers, its number and its opponent.
Say this: “Every measure moves one multiplier, and every measure has a loser.”
04 Question types and worked steps
| Type | Example | Steps | Answer |
|---|---|---|---|
| Risk calculation | Explain why the same hazard produces different risk in two places | Four steps: state the three factors, give values for both places, compute the ratio, name the most changeable factor | 0.48 against 0.06, a factor of 8 |
| Return period probability | Calculate the probability of an event over a given period | Four steps: annual probability is one over the return period, use one minus the power, convert to a percentage, draw the planning meaning | One in 100: 39.5 per cent over fifty years, 26.0 per cent over thirty |
| Loss and recovery | Evaluate the impact of a disaster on two economies | Four steps: loss divided by GDP, compare shares, discuss recovery time, add insurance and aid | 5.25 against 0.26 per cent, a factor of 20 |
| Evaluating management | Evaluate pre-event and post-event management strategies | Four steps: classify before and after, match to a multiplier, give a number and a cost, state the limit | Zoning moves 4,800; a wall cuts 66.7 per cent; isolation cuts 65 per cent |
| Future trends | Discuss how hazard risk may change in the future | Four steps: frequency trend, exposure trend, vulnerability trend, combine through the multipliers | Survival 90 per cent at 24 hours against 50 at 72 |
05 Independent practice (3 questions)
| Question | Answer | What to watch |
|---|---|---|
| (a) Place A has exposure 0.8 and vulnerability 0.6 at hazard 1; what is its risk? (b) Place B has 0.3 and 0.2? (c) How many times greater is A? | (a) 0.48; (b) 0.06; (c) 8 times | All three inputs are proportions, so the answer carries no units |
| For a one-in-100 event, what is the chance of at least one occurrence in thirty years and in fifty years, and how should that shape city planning? | 26.0 per cent and 39.5 per cent | Planning horizons need the cumulative chance, not the annual one per cent |
| A loss of 2.1 billion lands on economies of 40 and 800 billion. What share of GDP is each, and why does recovery differ by a decade? | 5.25 and 0.26 per cent, a factor of 20 | Recovery depends on scale, reserves and insurance, not on the hazard alone |
06 Common mistakes and what to say
| Mistake | Student writes | Say this |
|---|---|---|
| Treating hazard as risk | Writing that a magnitude 7 earthquake must cause heavy losses | Risk is three multipliers: 0.48 against 0.06 share a hazard, and the gap comes from exposure 0.8 against 0.3 and vulnerability 0.6 against 0.2. |
| Adding probabilities | Writing that a one-in-100 event gives a 50 per cent chance in fifty years | It is 39.5 per cent, from 1 minus 0.99 to the fiftieth. Events can repeat, so probabilities neither add nor scale linearly. |
| Only engineering | Writing that a taller sea wall is the answer | Engineering moves one multiplier. Zoning moves exposure, insurance and retrofit move vulnerability, warning moves casualties, and a wall cuts 66.7 per cent with an over-design residual. |
| Ignoring false alarms | Writing that any warning system is beneficial | Warnings carry a credibility cost: evacuating 20,000 people at 2.4 million per false alarm, and repeated errors mean the next warning is ignored. |
07 Homework (paper, section and question numbers)
- IB Geography chapter index — All chapters in this subject
- IB Geography: Option D plate systems, volcanoes and earthquakes — Prerequisite: where the hazard comes from, which this chapter turns into risk
- IB Geography: urban challenges and sustainable management — Extension: density and exposure, which is the first multiplier in practice
08 Exit check (last 5 minutes)
| Question | Answer | Decision |
|---|---|---|
| Three factors | What risk multiplies | Missing one means the definition is incomplete |
| Return period | Chance of a one-in-100 event over fifty years | An answer of 50 per cent means probabilities were added |
| Measures | Which multiplier zoning lowers | Saying hazard means the mechanism is wrong |
09 Tutor FAQ
Must students write the formula?
It helps, because it signals the three factors at once. Write risk as hazard times exposure times vulnerability, then give a value for each: the structure of a fifteen-mark answer appears immediately.
Which case study should be used?
Whichever the school taught. The common contrast is one hazard type in a developed and a developing context, or one city before and after retrofitting. The three multipliers and four factor groups transfer to any pair.
Can one in a hundred years be described as once a century?
No. It is 1 per cent a year and 39.5 per cent over fifty, so saying once a century invites the false comfort that a recent event buys safety. This is a common failure in disaster communication.
Find a tutor — freeTutor Registration →
A TutorZone lesson-prep guide. Written by the TutorZone team; questions and lesson flow are original and are not taken from any school or publisher material.



