Ten challenge items Every item here needs at least two steps: 33 times 3.6 gives 118.8 for signal 10, 0.28 m over 2 square kilometres gives 560 000 cubic metres, and 2.1 plus 2.4 m against a 4.0 m wall decides overtopping. Later items test 990 divided by 22 hours, 3 600 people at 900 per hour, 40 mm of undrained water and soil going from 35 to 50 percent saturation.
01 Paper details (check answers afterwards)
| Item | Detail |
|---|---|
| Questions | 10 |
| Suggested time | 25 |
| Difficulty mix | Foundation 4 · Intermediate 2 · Challenge 2 · Error redo 2 |
| Chapter | Chapter: S1 Geography: Natural hazards and warning responses |
| Level | Challenge |
02 Questions (10 items)
- FoundationA wind blows at 33 metres per second. What is that in km per hour, and which signal applies?
- FoundationBlack rain of 70 mm per hour lasts 4 hours over a 2 square kilometre catchment. What volume falls?
- FoundationA typhoon raises sea level by 2.1 m and the astronomical high tide is 2.4 m. The seawall is 4.0 m. Does water overtop it?
- FoundationBy what percentage does the upper limit of signal 8 exceed the lower limit?
- IntermediateA tropical cyclone is 990 km away and closing at 22 km per hour. How long until it nears Hong Kong?
- IntermediateA warning comes 6 hours ahead for 3 600 people at 900 per hour. Is there enough time?
- ChallengeUrban drains handle 30 mm of rain per hour but black rain delivers 70 mm. How much ponds each hour?
- ChallengeIn signal 10 the wind reaches 130 km per hour. What is that in metres per second?
- Error redoSlope soil is 35 percent water with saturation at 45 percent. Another storm adds 15 percentage points. Is it saturated?
- Error redoA tropical cyclone covers 240 km in 12 hours. What is its average speed?
03 Answers and one-line notes
| # | Answer | One-line note |
|---|---|---|
| 1 | 118.8 km per hour, which is hurricane signal 10 | 33 times 3.6 gives 118.8, just past the 118 km per hour threshold for signal 10. |
| 2 | About 560 000 cubic metres | 70 times 4 gives 280 mm or 0.28 m, and 0.28 times 2 million square metres gives 560 000 cubic metres. |
| 3 | Yes, the level reaches 4.5 m, overtopping by 0.5 m | 2.1 plus 2.4 gives 4.5 m against a 4.0 m wall, so sea water floods the low-lying land behind it. |
| 4 | About 85.7 percent | (117 minus 63) divided by 63 times 100 gives 85.7, so conditions vary widely within signal 8. |
| 5 | 45 hours | 990 divided by 22 gives 45 hours, almost two days for staged evacuation and securing sites. |
| 6 | Just enough: 4 hours are needed, leaving 2 hours spare | 3 600 divided by 900 gives 4 hours, leaving 2 hours of buffer for traffic and people needing help. |
| 7 | 40 mm | 70 minus 30 leaves 40 mm that cannot drain, which is why low-lying roads flood quickly. |
| 8 | About 36.1 metres per second | 130 divided by 3.6 gives 36.1, the reverse of the multiply by 3.6 used the other way. |
| 9 | Yes: it reaches 50 percent, above the 45 percent saturation point | 35 plus 15 gives 50, past saturation, so pore pressure rises and the slope becomes unstable. |
| 10 | 20 km per hour | 240 divided by 12 gives 20 km per hour, useful for estimating arrival but storms do speed up and slow down. |
04 What to do after marking
- After marking, redo only the wrong items and write down which step went wrong (formula, unit, or misread number).
- Repeat the same item two days later; move to the next paper only when both attempts are correct.
- Parents only need the answer and note columns; there is no need to explain every item.