S2 Geography Mass movement and slope failure Paper 2
- 2026-11-18
S2 Geography Mass movement and slope failure Paper 2
Ten intermediate items on triggers, vegetation and engineering measures, and the measured effect of steepening a slope.
Causes and control of slope failure Separate triggers from long-term conditions, compare slopes with tangent values, then place drains, vegetation and engineering works in one risk framework.
01 Paper details (check answers afterwards)
| Item | Detail |
|---|---|
| Questions | 10 |
| Suggested time | 25 |
| Difficulty mix | Foundation 4 · Intermediate 2 · Challenge 2 · Error redo 2 |
| Chapter | Chapter: S2 Geography: Mass movement and slope failure |
| Level | Intermediate |
02 Questions (10 items)
- FoundationWhat is the main trigger of slope failure after a rainstorm?
- FoundationHow does vegetation mainly reduce slope failure?
- FoundationRainfall in 24 hours reaches 250 mm against a 100 mm alert level. How many times the alert is that?
- FoundationA slope is cut from 30 degrees to 45 degrees. By what percentage does the downslope component increase?
- IntermediateA drain clears 0.4 cubic metres per second and 1,440 cubic metres have pooled. How many minutes to clear?
- IntermediateA slope rises 50 metres across a horizontal run of 250 metres. What is the gradient in per cent?
- ChallengeA failure releases 800 cubic metres at 2.2 tonnes per cubic metre. What is the mass?
- ChallengeWhat do soil nails, retaining walls and drainage pipes each do?
- Error redoWhen rainstorm and landslip warnings are both in force, what should residents near slopes do?
- Error redoGive two environmental reasons why slope failure is common in Hong Kong.
03 Answers and one-line notes
| # | Answer | One-line note |
|---|---|---|
| 1 | Heavy infiltration raises pore water pressure. | Water adds weight and reduces resisting strength, so steep slopes fail first in the same storm. |
| 2 | Roots reinforce the soil and the canopy intercepts rain. | Roots raise resisting strength while canopy and litter cut direct raindrop impact and infiltration. |
| 3 | 2.5 times. | 250 divided by 100 is 2.5, and the further above the alert level, the more landslide reports are filed. |
| 4 | About 73 per cent. | Tan 45 degrees over tan 30 degrees is about 1.73, a rise of roughly 73 per cent. |
| 5 | 60 minutes. | 1,440 divided by 0.4 is 3,600 seconds, or 60 minutes, and poor drainage lets water pressure build up. |
| 6 | 20 per cent. | 50 divided by 250 times 100 is 20, and a shorter run for the same rise means a steeper slope. |
| 7 | 1,760 tonnes. | 800 times 2.2 is 1,760, and weathered volcanic soil in Hong Kong is commonly near 2. |
| 8 | Nails reinforce the mass, walls support the toe, drains lower water pressure. | Each tackles a different cause, so engineering schemes usually combine all three. |
| 9 | Keep away from slopes and retaining walls, and avoid paths at the toe. | A landslip warning means slopes in the district are highly unstable, so leaving the toe area is the most effective protection. |
| 10 | Steep terrain with thick weathered profiles, and intense summer rainstorms. | Hong Kong combines steep hillsides, deep weathered granite and very intense summer rainfall, and the three together make failures frequent. |
04 What to do after marking
- After marking, redo only the wrong items and write down which step went wrong (formula, unit, or misread number).
- Repeat the same item two days later; move to the next paper only when both attempts are correct.
- Parents only need the answer and note columns; there is no need to explain every item.
Download the full ten-item paper as a PDF, answers and notes included.Tutor Registration →
Questions and answers are written originally by the TutorZone team and are not taken from any school, publisher or examination authority paper. Every value is checked by computer.



