Storm hydrographs and flood risk (intermediate practice)
- 2026-11-19
Storm hydrographs and flood risk (intermediate practice)
Read lag time and peak discharge from a hydrograph, then analyse how urbanisation, vegetation and rainfall intensity change the flood response.
The flood response and what controls it A hydrograph puts rainfall and discharge on one timeline, and lag time with peak discharge are the two keys to flood risk.
01 Paper details (check answers afterwards)
| Item | Detail |
|---|---|
| Questions | 10 |
| Suggested time | 25 |
| Difficulty mix | Foundation 4 · Intermediate 2 · Challenge 2 · Error redo 2 |
| Chapter | Chapter: S3 Geography: River processes and flood management |
| Level | Intermediate |
02 Questions (10 items)
- FoundationWhat does lag time mean on a storm hydrograph?
- FoundationWhat change does urbanisation usually make to a storm hydrograph?
- FoundationHow does more vegetation and woodland affect flooding?
- FoundationName three common hard flood defences.
- IntermediatePeak rainfall is at 14:00 and peak discharge at 20:00. What is the lag time?
- IntermediateA 25 square kilometre catchment receives 80 mm of rain. What is the total volume of rainfall?
- ChallengeAfter afforestation, runoff falls from 320 mm to six tenths of that value. What is the new runoff?
- ChallengeA flood with a 50-year return period has what chance of occurring in any one year?
- Error redoDoes a shorter lag time mean a smaller flood?
- Error redoCan levees reduce the total volume of water downstream?
03 Answers and one-line notes
| # | Answer | One-line note |
|---|---|---|
| 1 | The time between the peak of rainfall and the peak of river discharge. | Lag time shows how quickly a catchment delivers rainwater to the channel. |
| 2 | A higher peak discharge and a shorter lag time. | Impermeable surfaces stop infiltration, so rain reaches the river quickly through drains. |
| 3 | Interception and infiltration rise, runoff falls, and the peak is lower with a longer lag time. | Canopies catch rain and roots loosen the soil, and both slow the water on its way to the channel. |
| 4 | Dams, levees or flood walls, and channel straightening. | Hard defences change the flow with concrete or earth structures: quick results at a high cost. |
| 5 | 6 hours. | 20:00 minus 14:00 is 6 hours, and a shorter lag leaves less time for warning. |
| 6 | About 2000000 cubic metres. | 0.08 metres times 25000000 square metres gives 2000000 cubic metres before losses to infiltration and evaporation. |
| 7 | 192 mm. | 320 times 0.6 is 192, a fall of 128 mm or forty per cent. |
| 8 | Two per cent in any year. | 100 divided by 50 is 2, and a return period is not a guarantee of one flood every 50 years. |
| 9 | No. | A short lag means a fast-responding catchment, and the peak is usually higher and sharper as well. |
| 10 | No. | Levees only keep water inside the channel, and if they fail the flooding downstream is more sudden. |
04 What to do after marking
- After marking, redo only the wrong items and write down which step went wrong (formula, unit, or misread number).
- Repeat the same item two days later; move to the next paper only when both attempts are correct.
- Parents only need the answer and note columns; there is no need to explain every item.
Download the full ten-item paper as a PDF, answers and notes included.Tutor Registration →
Questions and answers are written originally by the TutorZone team and are not taken from any school, publisher or examination authority paper. Every value is checked by computer.