/en-tutor-prep-s3-geography-river-processes-flood-management-practice-2/
/en-tutor-prep-s3-geography-river-processes-flood-management-practice-2/
General Inquiry: info@TutorZone.com.hk
Office Hours: Monday to Saturday - 9:00 AM to 6:00 PM
WhatsApp Monday to Sunday - 24 hours
Hotline: +852 6828 1809
Instant Support: +852 9061 3106

Storm hydrographs and flood risk (intermediate practice)

Storm hydrographs and flood risk (intermediate practice)

  • 2026-11-19

Storm hydrographs and flood risk (intermediate practice)

Read lag time and peak discharge from a hydrograph, then analyse how urbanisation, vegetation and rainfall intensity change the flood response.

The flood response and what controls it A hydrograph puts rainfall and discharge on one timeline, and lag time with peak discharge are the two keys to flood risk.

01 Paper details (check answers afterwards)

Item Detail
Questions 10
Suggested time 25
Difficulty mix Foundation 4 · Intermediate 2 · Challenge 2 · Error redo 2
Chapter Chapter: S3 Geography: River processes and flood management
Level Intermediate

02 Questions (10 items)

  1. FoundationWhat does lag time mean on a storm hydrograph?
  2. FoundationWhat change does urbanisation usually make to a storm hydrograph?
  3. FoundationHow does more vegetation and woodland affect flooding?
  4. FoundationName three common hard flood defences.
  5. IntermediatePeak rainfall is at 14:00 and peak discharge at 20:00. What is the lag time?
  6. IntermediateA 25 square kilometre catchment receives 80 mm of rain. What is the total volume of rainfall?
  7. ChallengeAfter afforestation, runoff falls from 320 mm to six tenths of that value. What is the new runoff?
  8. ChallengeA flood with a 50-year return period has what chance of occurring in any one year?
  9. Error redoDoes a shorter lag time mean a smaller flood?
  10. Error redoCan levees reduce the total volume of water downstream?

03 Answers and one-line notes

# Answer One-line note
1 The time between the peak of rainfall and the peak of river discharge. Lag time shows how quickly a catchment delivers rainwater to the channel.
2 A higher peak discharge and a shorter lag time. Impermeable surfaces stop infiltration, so rain reaches the river quickly through drains.
3 Interception and infiltration rise, runoff falls, and the peak is lower with a longer lag time. Canopies catch rain and roots loosen the soil, and both slow the water on its way to the channel.
4 Dams, levees or flood walls, and channel straightening. Hard defences change the flow with concrete or earth structures: quick results at a high cost.
5 6 hours. 20:00 minus 14:00 is 6 hours, and a shorter lag leaves less time for warning.
6 About 2000000 cubic metres. 0.08 metres times 25000000 square metres gives 2000000 cubic metres before losses to infiltration and evaporation.
7 192 mm. 320 times 0.6 is 192, a fall of 128 mm or forty per cent.
8 Two per cent in any year. 100 divided by 50 is 2, and a return period is not a guarantee of one flood every 50 years.
9 No. A short lag means a fast-responding catchment, and the peak is usually higher and sharper as well.
10 No. Levees only keep water inside the channel, and if they fail the flooding downstream is more sudden.

04 What to do after marking

  • After marking, redo only the wrong items and write down which step went wrong (formula, unit, or misread number).
  • Repeat the same item two days later; move to the next paper only when both attempts are correct.
  • Parents only need the answer and note columns; there is no need to explain every item.

Download the full ten-item paper as a PDF, answers and notes included.Tutor Registration →

Questions and answers are written originally by the TutorZone team and are not taken from any school, publisher or examination authority paper. Every value is checked by computer.

Join as a tutor or coach — academic, music, sports, arts, STEM. Free to register. See how it works →