River management and Hong Kong cases (retry practice)

River management and Hong Kong cases (retry practice)

  • 2026-11-19

River management and Hong Kong cases (retry practice)

Bring the whole chapter together and apply it to Hong Kong short, steep rivers and its rural flood plains.

Rivers and flood practice in Hong Kong Hong Kong channels are short and steep, so flood defence works on storage, blocking and drainage at once while rural flood plains are kept to cut the peak.

01 Paper details (check answers afterwards)

Item Detail
Questions 10
Suggested time 25
Difficulty mix Foundation 4 · Intermediate 2 · Challenge 2 · Error redo 2
Chapter Chapter: S3 Geography: River processes and flood management
Level Retry practice

02 Questions (10 items)

  1. FoundationWhat are most Hong Kong rivers like?
  2. FoundationWhat three methods are commonly used to manage rivers in Hong Kong?
  3. FoundationWhy are some flood plains kept in rural areas?
  4. FoundationFlood defence can be summed up in three words. What are they?
  5. IntermediateA storage tank holds 60000 cubic metres and fills at 5000 cubic metres per hour. How long to fill it?
  6. IntermediateDrainage works raise capacity from 30 to 45 cubic metres per second. What is the percentage increase?
  7. ChallengeA 12 square kilometre catchment gets 250 mm of rain in 24 hours. If all of it ran off, what would the mean discharge be?
  8. ChallengeA 3.5 square kilometre flood plain holds water 0.6 m deep. How much can it store?
  9. Error redoHong Kong reservoirs were built mainly for flood control. Is that correct?
  10. Error redoOnce a channel is covered or straightened, will the upstream area never flood again?

03 Answers and one-line notes

# Answer One-line note
1 Short and steep, with discharge that rises and falls very quickly after rain. Small catchments concentrate the rain fast, so the peak arrives quickly and also passes quickly.
2 Straightening and widening the channel, deepening the bed, and building levees and bank protection. Urban channels are largely concreted to gain extra discharge capacity.
3 So floodwater has room to spread out, which lowers the peak reaching the urban area downstream. Flood plain zoning is a soft measure: cheaper, but it needs land to be set aside.
4 Store, block and drain. Reservoirs and storage tanks hold water, levees block it and channels carry it away.
5 12 hours. 60000 divided by 5000 is 12, and the design capacity must match the rate of inflow.
6 Fifty per cent. 45 minus 30 is 15, and 15 over 30 is 0.5, so the capacity rises by half.
7 About 34.7 cubic metres per second. 0.25 times 12000000 gives 3000000 cubic metres, divided by 86400 seconds is 34.7.
8 2100000 cubic metres. 3500000 times 0.6 is 2100000, comparable to a large storage scheme.
9 No. Their main purpose is water supply, and flood control is only a side benefit.
10 No. Downstream capacity improves, but if rainfall in the upper catchment exceeds the channel capacity it will still flood.

04 What to do after marking

  • After marking, redo only the wrong items and write down which step went wrong (formula, unit, or misread number).
  • Repeat the same item two days later; move to the next paper only when both attempts are correct.
  • Parents only need the answer and note columns; there is no need to explain every item.

Download the full ten-item paper as a PDF, answers and notes included.Tutor Registration →

Questions and answers are written originally by the TutorZone team and are not taken from any school, publisher or examination authority paper. Every value is checked by computer.