DSE Economics | Opportunity Cost and the PPC Lesson-Prep Guide (Tutor Edition) | Trade-offs, Increasing Cost and Growth
- 2026-11-03
Students can recite “the highest-valued forgone option” yet answer “zero” the moment they see the word free. This lesson rebuilds free with two ledgers, money and time.
01 Prerequisites (3-minute check)
If any of these fails, fix it before the lesson starts.
| Skill | Quick check | Pass mark |
|---|---|---|
| Trade-off | What do we call limited resources against unlimited wants? | Scarcity |
| Money cost | Is a tuition fee part of opportunity cost? | Yes, but only part of it |
| Reading graphs | What does a point on the curve mean? | A combination with full employment of resources |
02 Lesson flow (60 minutes)
| Time | Stage | Tutor does | Student does |
|---|---|---|---|
| 0–10 min | Definition | Highest-valued forgone option | Give three everyday examples |
| 10–24 min | Calculation | Time cost plus money cost | Work one example fully |
| 24–38 min | The curve | Shape, slope and opportunity cost | Read increasing cost off the curve |
| 38–48 min | Shifts | Along the curve versus outward shift | Classify five scenarios |
| 48–56 min | Answer frame | Definition, explanation, conclusion | Rewrite one answer |
| 56–60 min | Exit check | Three questions collected | Independent |
03 Teaching script (read it out)
Scene 1: Opportunity cost always includes time
Add the tuition fee and travel time. Opportunity cost is the value of everything given up, not just notes and coins.
Make them answer: what is the opportunity cost of a free exhibition (the value of the queuing time).
Tutor move: use the student own timetable and price the hours given up.
Scene 2: The PPC: the slope is the opportunity cost
A curve bowed outward means increasing opportunity cost, because resources are not perfectly transferable. A point inside means unemployment or waste; on the curve means full employment; outside is currently impossible.
Tutor move: make them point at two dots and say what is given up.
Scene 3: Shifts: growth is not a move along the line
Test: moving from one point to another on the same curve is a trade-off; moving the whole curve out is a rise in capacity.
Warning: a gain in the ability to produce only one good shifts only one end of the curve, not the whole line in parallel.
Tutor move: five scenario cards, two piles only: along or outward.
04 Question types and worked steps
| Type | Example | Steps | Answer |
|---|---|---|---|
| Definition | Judge the opportunity cost of a choice | List forgone options, take the highest value | Money alone is wrong |
| Calculation | Convert time into income | Wage times hours | $600 |
| Graph | Read opportunity cost from the slope | Fall in Y divided by rise in X | 3 units of Y |
| Classify | Movement along or shift out | Ask whether capacity changed | A shift needs one of three sources |
05 Independent practice (3 questions)
| Question | Answer | What to watch |
|---|---|---|
| Wage $75 for 8 hours, income forgone | $600 | Wage times hours |
| 20 more X costs 60 Y, cost per unit of X | 3 units of Y | Y divided by X |
| What does a point inside the curve show | Unemployment or unused resources | Not impossible, just unused |
06 Common mistakes and what to say
| Mistake | Student writes | Say this |
|---|---|---|
| Free means zero cost | Answers that opportunity cost is zero | “Only the price is zero; time and queuing are costs.” |
| Money only | Omits forgone income | “Your time has a market price; leave it out and the answer shrinks.” |
| Shift for a movement | Calls a demand rise an outward shift | “Capacity did not change, so it is a move along the curve.” |
| Slope inverted | Divides X by Y | “X is horizontal, Y is vertical; cost is vertical over horizontal.” |
07 Homework (paper, section and question numbers)
- Opportunity cost worksheet (in-house) — Questions 1–3: cost three choices
- PPC reading worksheet (in-house) — Questions 4–6: classify five scenarios and draw a shift
08 Exit check (last 5 minutes)
| Question | Answer | Decision |
|---|---|---|
| Opportunity cost of 8 hours at $75 | $600 | Missing time cost: reteach the definition |
| 20 more X for 60 Y, cost per unit | 3 units of Y | Inverted: re-drill the slope |
| New production technology, what happens to the curve | It shifts outward as a whole | All correct: move to demand and supply |
09 Tutor FAQ
Does sleep have an opportunity cost?
Yes: the value of whatever else could have been done.
Is the curve always bowed outward?
It is a straight line when resources are perfectly transferable.
Is unemployment a cost?
It is unused capacity inside the curve, not an opportunity cost.
Find a tutor — freeTutor Registration →
A TutorZone lesson-prep guide. Written by the TutorZone team; questions and lesson flow are original and are not taken from any school or publisher material.


