Ten items on measurement and engineering judgement: rainfall increase, moisture percentage points, driving force ratio, cut-off drains, soil nails, the 1977 system, vegetation clearance, drainage priority, the angle of repose and a retaining wall misconception.
Direct answers Items 1-3: 50 per cent, 30 percentage points, about 1.5 times. Items 4-6: cut-off drains, soil nail anchorage, the 1977 office. Items 7-9: three effects of vegetation, drainage first, an angle of repose near 35 degrees. Item 10: earth pressure rises with wall height.
01 Paper details (check answers afterwards)
| Item | Detail |
|---|---|
| Questions | 10 |
| Suggested time | 20 |
| Difficulty mix | Foundation 3 · Intermediate 3 · Challenge 3 · Error redo 1 |
| Chapter | Chapter: DSE Geography Mass Movement and Slope Safety |
| Level | Intermediate |
02 Questions (10 items)
- FoundationTwenty-four hour rainfall rises from 100 mm to 150 mm. What is the increase?
- FoundationSoil moisture rises from 60 per cent to 90 per cent. How many percentage points is that?
- FoundationGradient rises from 25 to 30 degrees. By what factor does the downslope driving force (proportional to tan of the angle) grow?
- IntermediateWhat is the main purpose of a cut-off drain above a slope?
- IntermediateHow does soil nailing strengthen a slope?
- IntermediateAfter several severe slope failures in the 1970s, how did the Hong Kong government respond institutionally?
- ChallengeWhy does clearing vegetation raise slope risk?
- ChallengeWhy is drainage usually preferred to building a taller retaining wall?
- ChallengeWhat is the angle of repose, and how does it relate to stability?
- Error redoError clinic: “The taller the retaining wall, the safer the slope.” What is wrong?
03 Answers and one-line notes
| # | Answer | One-line note |
|---|---|---|
| 1 | 50.0 per cent | The extra 50 mm divided by the original 100 mm. |
| 2 | 30 percentage points | Percentage points subtract directly; the relative increase would be 50 per cent. |
| 3 | about 1.24 times | Tangent of 30 degrees divided by tangent of 25 degrees, or 0.577 over 0.466. |
| 4 | to intercept runoff from upslope and stop water entering the slope body | If water stays out of the slope, pore water pressure is less likely to rise. |
| 5 | steel bars or tubes are inserted to anchor the unstable mass to the more stable ground behind, raising overall resistance | Unlike a retaining wall, nailing relies on anchorage rather than wall weight. |
| 6 | the Geotechnical Engineering Office was set up in 1977, creating slope safety control and audit | The shift was from case-by-case approval to systematic slope registration and risk management. |
| 7 | canopy interception and transpiration fall, runoff and erosion rise, and root cohesion at the surface is lost | Three effects act together, so the risk is not down to one cause. |
| 8 | removing groundwater lowers pore water pressure and so reduces the driving force, at lower cost | A taller wall only adds resistance, while water pressure behind it grows as well. |
| 9 | the steepest angle at which loose material still stands, about 35 degrees for sand; beyond it, movement starts | It is the natural limit for uncemented loose material. |
| 10 | wrong: earth pressure behind the wall rises with height, so raising a wall without better drainage and foundations can be more dangerous | Stability is a balance of resistance and driving force, not a matter of size alone. |
04 What to do after marking
- After marking, redo only the wrong items and write down which step went wrong (formula, unit, or misread number).
- Repeat the same item two days later; move to the next paper only when both attempts are correct.
- Parents only need the answer and note columns; there is no need to explain every item.
Compare measures on both resistance and driving force.Tutor Registration →
Questions and answers are written originally by the TutorZone team and are not taken from any school, publisher or examination authority paper. Every value is checked by computer.