DSE Geography: River Processes and Landforms (Tutor Lesson Plan) | Discharge, sinuosity and channel roughness
- 2026-11-04
Students draw V-shaped valleys and meanders, then use the wrong formula for discharge or confuse load with discharge. This lesson keeps three numbers apart: cross-section, velocity and sediment concentration.
01 Prerequisites (3-minute check)
If any of these fails, fix it before the lesson starts.
| Skill | Quick check | Pass mark |
|---|---|---|
| Area | Area of a rectangular cross-section | Width times mean depth |
| Units | Litres in one cubic metre | 1000 L |
| Processes | Order of erosion, transport and deposition | Erosion upstream, deposition downstream |
02 Lesson flow (60 minutes)
| Time | Stage | Tutor does | Student does |
|---|---|---|---|
| 0-10 min | Discharge | Cross-section times velocity | 14.4 cubic metres per second |
| 10-22 min | Velocity | Hydraulic radius and Manning | About 1.02 m/s |
| 22-34 min | Erosion and transport | Four processes each | Match landform to process |
| 34-46 min | Sinuosity and deposition | Channel length over valley length | Sinuosity 1.5 |
| 46-56 min | Catchment management | Hard against soft engineering | Two limits for each |
| 56-60 min | Exit check | Three questions marked at once | Independent |
03 Teaching script (read it out)
Scene 1: Discharge: keep three numbers apart
Discharge = area times velocity = 18.0 times 0.8 = 14.4 cubic metres per second, which is 14,400 litres a second.
Wetted perimeter = 12 plus 3.0 = 15.0 m, so hydraulic radius = 18.0 over 15.0 = 1.20 m.
Manning gives velocity = (1 over n) times R to the two thirds times the square root of slope, about 1.02 m/s for n = 0.035 and slope 0.001, the same order as the measured 0.8 m/s.
Tutor move: insist on units every time. Square metres times metres per second is cubic metres per second, and wrong units expose a wrong number.
Scene 2: Erosion, transport and deposition: follow the energy
Four transport processes: solution, suspension, saltation and traction, with the coarsest load moving by traction.
Deposition happens when velocity falls, so sand and silt settle downstream and deltas form at the mouth.
Sinuosity = channel length over valley length = 6.0 over 4.0 = 1.5, and above 1.5 the meandering is clear.
Ask the student: if velocity halves, by roughly what factor does the largest transportable particle fall (about sixty-four times, since the required velocity scales with the square root of grain size)?
Scene 3: Catchment management: hard against soft
Soft schemes: meander restoration, riparian planting, wetland storage and land-use zoning. They are cheaper and better for ecology, but act slowly and need long maintenance.
With 0.8 kg per cubic metre and 14.4 cubic metres per second, the load is 11.52 kg a second, about 995 tonnes a day.
Reminder: compare schemes on timescale and on who pays, because costs and benefits without a timescale score low.
04 Question types and worked steps
| Type | Example | Steps | Answer |
|---|---|---|---|
| Calculation | Discharge | Area times velocity | 14.4 cubic metres per second |
| Calculation | Hydraulic radius and Manning | Area over wetted perimeter, then n and slope | R = 1.20 m, v about 1.02 m/s |
| Calculation | Sediment load | Discharge times concentration, then per day | About 995 tonnes a day |
| Comparison | Hard against soft engineering | Cost, speed and ecology | Two limits for each |
05 Independent practice (3 questions)
| Question | Answer | What to watch |
|---|---|---|
| Cross-section for width 12 m and depth 1.5 m | 18.0 square metres | Width times mean depth |
| Discharge at 0.8 m/s | 14.4 cubic metres per second | Area times velocity |
| Daily load at 0.8 kg per cubic metre | About 995 tonnes | Discharge times concentration times 86400 |
06 Common mistakes and what to say
| Mistake | Student writes | Say this |
|---|---|---|
| Reporting the cross-section as discharge | Answering 18.0 | “Multiply the area by velocity; only then are the units cubic metres per second.” |
| Using depth as the hydraulic radius | Answering R = 1.5 m | “The wetted perimeter includes both banks, so R is 1.20 m.” |
| Confusing concentration with load | Answering 0.8 kg a second | “0.8 is the mass in each cubic metre, so multiply by discharge.” |
| Listing only hard engineering benefits | Four advantages and no limit | “Every scheme needs a limit on cost, timescale or ecology.” |
07 Homework (paper, section and question numbers)
- DSE geography practice paper (rivers and landforms) — Section A data response and Section B evaluation
- Secondary geography chapter index — All chapters
08 Exit check (last 5 minutes)
| Question | Answer | Decision |
|---|---|---|
| Cross-section for 12 m by 1.5 m | 18.0 square metres | All three right: move to coasts |
| Discharge at 0.8 m/s | 14.4 cubic metres per second | One wrong: reteach units |
| Which is larger, hydraulic radius or mean depth | Mean depth is larger | Two wrong: restart act one |
09 Tutor FAQ
Must students memorise Manning?
No, but they should use it to explain why a rougher bed carries slower flow.
Why does discharge rise downstream?
Tributaries enlarge the catchment, so flow grows even at the same rainfall.
Why can a dam worsen downstream erosion?
It traps sediment, so clear sediment-starved water erodes the bed and banks.
Find a tutor — freeTutor Registration →
A TutorZone lesson-prep guide. Written by the TutorZone team; questions and lesson flow are original and are not taken from any school or publisher material.