/en-tutor-prep-s5-geography-river-landforms-flood-management-practice-4/
/en-tutor-prep-s5-geography-river-landforms-flood-management-practice-4/
General Inquiry: info@TutorZone.com.hk
Office Hours: Monday to Saturday - 9:00 AM to 6:00 PM
WhatsApp Monday to Sunday - 24 hours
Hotline: +852 6828 1809
Instant Support: +852 9061 3106

S5 Geography river landforms practice 4: ten retry items on common errors

S5 Geography river landforms practice 4: ten retry items on common errors

  • 2026-11-18

S5 Geography river landforms practice 4: ten retry items on common errors

Ten items built from the most frequent wrong answers: meander banks, the definition of lag time, discharge units, and the real limits of straightening and planting.

S5 Geography river landforms practice: retry items This paper targets the marks lost in earlier papers: meander banks, the definition of lag time, discharge units, and how far straightening and planting actually help. Runoff coefficient, return period, reservoir siltation and channel overload calculations reinforce the same points, and each item states exactly what went wrong.

01 Paper details (check answers afterwards)

Item Detail
Questions 10
Suggested time 25
Difficulty mix Foundation 4 · Intermediate 2 · Challenge 2 · Error redo 2
Chapter Chapter: S5 Geography: river landforms and flood management
Level Retry

02 Questions (10 items)

  1. FoundationRetry: the inner bank of a meander is eroded because flow is fast there — true?
  2. FoundationChannel width 8 m, mean depth 1.5 m, velocity 2 m/s. Find the discharge.
  3. FoundationRetry: lag time is the interval from the start to the end of rainfall — true?
  4. FoundationRunoff coefficient 0.6 with 50 mm of rain gives what runoff depth?
  5. IntermediateRetry: straightening a channel fully prevents downstream flooding — true?
  6. IntermediateFor a 20-year return period, what is the chance of at least one flood in two years?
  7. ChallengeRetry: discharge was written in m/s. What is the correct unit, and the discharge for 5 m² at 3 m/s?
  8. ChallengeA reservoir holds 150 million m³ and loses 8% to siltation. How much capacity is lost?
  9. Error redoPeak 400 m³/s against a channel capacity of 320 m³/s. What is the exceedance and the diversion needed?
  10. Error redoRetry: afforestation removes the flood peak immediately — true?

03 Answers and one-line notes

# Answer One-line note
1 False; the outer bank erodes and the inner bank gains a slip-off slope Inertia drives the fast thread of flow to the outer bank.
2 24 m³/s 8 × 1.5 × 2 = 24.
3 False; lag time is the gap between peak rainfall and peak discharge Lag time shows how quickly a catchment delivers water to the channel.
4 30 mm 50 × 0.6 = 30.
5 False; it only speeds drainage, and the peak may arrive earlier and higher Flood defence needs storage, diversion and land-use measures as well.
6 About 9.8% 5% a year; 1 − 0.95² = 0.0975.
7 m³/s; discharge is 15 m³/s Discharge is a volume per second, not a speed.
8 12 million m³ 1.5 × 10⁸ × 0.08.
9 25% over; 80 m³/s must be diverted (400 − 320) ÷ 320 × 100 = 25%.
10 False; it mainly lengthens lag time and lowers the peak, and takes years to work Trees must mature before interception and infiltration reach full effect.

04 What to do after marking

  • After marking, redo only the wrong items and write down which step went wrong (formula, unit, or misread number).
  • Repeat the same item two days later; move to the next paper only when both attempts are correct.
  • Parents only need the answer and note columns; there is no need to explain every item.

Download the full ten-item paper as a PDF, answers and notes included.Tutor Registration →

Questions and answers are written originally by the TutorZone team and are not taken from any school, publisher or examination authority paper. Every value is checked by computer.

Join as a tutor or coach — academic, music, sports, arts, STEM. Free to register. See how it works →