  • 2026-11-04

Two failures account for most lost marks: a decision diamond with one exit, and a loop count that is one too many. A trace table turns both into the same habit.

Objectives — Students can: (1) use the 5 standard symbols correctly; (2) fill a trace table line by line; (3) show that 6 iterations take 15 steps and 7 condition tests.

01 Prerequisites (3-minute check)

If any of these fails, fix it before the lesson starts.

Skill Quick check Pass mark
Variables Variable versus assignment Assignment overwrites
Conditions if versus while while repeats
Input and output Symbols for input and output Parallelogram

02 Lesson flow (60 minutes)

Time Stage Tutor does Student does
0-8 min Diagnosis Match four symbols State the purpose
8-22 min Five symbols Terminator, process, decision, I/O, connector Draw one complete chart
22-36 min Trace table One row per executed line Fill the table
36-48 min Loop counts Init, condition, update Count steps aloud
48-56 min Question drill Spot the error, fill the gap Answer in steps
56-60 min Exit check Three quick items Spoken answers

03 Teaching script (read it out)

Scene 1: Act 1: Five symbols, one mistake costs a mark

The 5 standard symbols are oval, rectangle, diamond, parallelogram and connector circle. Every decision diamond needs two exits, labelled yes and no.
Students do: draw a chart that inputs two numbers and outputs the larger, then count the diamonds.
Common slip: a decision drawn as a rectangle, leaving no labelled exits.

Tutor move: peer-mark symbol by symbol, circling the wrong shape only.

Scene 2: Act 2: A trace table is cheap insurance

Columns: line, condition, variable values, output. Write one row per executed line and never skip.
Students do: fill a 12-cell trace table for a running total.
Common slip: recording the updated value on the row before the test, which shifts every answer by one.

Tutor move: one number per cell; two numbers means a skipped line.

Scene 3: Act 3: Count the tests, not the body

For 6 iterations: one initialisation, two steps per pass (test and update), and one final failing test, giving 15 steps, 7 tests and a body run 6 times.
Students do: write the three numbers beside the chart and check each other.
Rule: tests equal iterations plus one, because the last test fails.

Tutor move: hand-count with n equal to two before trusting the formula.

04 Question types and worked steps

Type Example Steps Answer
Draw the flowchart List steps, pick symbols, label exits, check both branches Two exits per diamond
Trace table One row per line, record all variables No skipped rows
Count iterations Identify init, test, update, count tests Tests equal iterations plus one
Spot the error Check symbols, branches, update One fault per item
Sanity check (teach this): There are 5 symbols, not four or six. For 6 iterations the path is 15 steps and the condition is tested 7 times because the final test fails; the trace table has 12 cells. Any answer claiming the body runs 7 times is wrong.

05 Independent practice (3 questions)

Question Answer What to watch
Number of standard symbols 5 Count the shapes
Steps for 6 iterations 15 One init plus two per pass
Condition tests for 6 iterations 7 Iterations plus one

06 Common mistakes and what to say

Mistake Student writes Say this
Diamond with one exit Only the true branch drawn “Where does false go?”
Body counted as tests Answering seven loops “How many times did the body run?”
Two changes in one row Skipping a line in the trace “Which line changed the variable?”
Wrong shapes Decision inside a rectangle “Does this shape have two exits?”

07 Homework (paper, section and question numbers)

08 Exit check (last 5 minutes)

Question Answer Decision
Exits on a decision symbol Two Wrong: reteach branching
Tests for 6 iterations 7 Wrong: reteach the plus one rule
Symbol for input Parallelogram Wrong: reteach the five symbols

09 Tutor FAQ

Must a flowchart end with a terminator

Yes, an unterminated chart is marked incomplete.

Can a loop be written as repeat-until

Yes, but the test comes after the body, so counts differ by one.

Why keep a trace table in the exam

It turns a logic question into arithmetic the marker can follow.

Find a tutor — freeTutor Registration →

A TutorZone lesson-prep guide. Written by the TutorZone team; questions and lesson flow are original and are not taken from any school or publisher material.

Join as a tutor or coach — academic, music, sports, arts, STEM. Free to register. See how it works →