S5 ICT Big Data Analysis Pipeline Practice 1 (Basic)
- 2026-11-18
S5 ICT Big Data Analysis Pipeline Practice 1 (Basic)
Ten items start from the five Vs and the five pipeline stages, then cover capacity from record counts, sample size and batch versus stream processing.
The five Vs and the five pipeline stages Remember the order collect, clean, store, analyse, visualise, and multiply before dividing in capacity items.
01 Paper details (check answers afterwards)
| Item | Detail |
|---|---|
| Questions | 10 |
| Suggested time | 25 |
| Difficulty mix | Foundation 4 · Intermediate 2 · Challenge 2 · Error redo 2 |
| Chapter | Chapter: S5 ICT: big data analysis pipeline |
| Level | Basic |
02 Questions (10 items)
- FoundationWhich of the five Vs of big data describes the sheer amount of data?
- FoundationWhich of these is unstructured data: a CSV table, a member-name column, CCTV video, a transaction-amount column?
- FoundationPut the five stages of a big data pipeline in order: analyse, collect, visualise, clean, store.
- FoundationWhat do the three letters of ETL stand for?
- IntermediateA data set has 1 000 000 records of 200 bytes each. What is the total size in MB (1 MB = 1 048 576 bytes, 1 decimal place)?
- IntermediateA system adds 5 GB of logs a day. How many GB accumulate in 30 days?
- ChallengeTen million log lines of 120 bytes each. What is the total in GB (1 GB = 1 073 741 824 bytes, 2 decimal places)?
- ChallengeA 1 per cent sample is drawn from 500 000 users. How many users are in the sample?
- Error redoTo detect credit-card fraud the moment it happens, should batch processing or stream processing be used?
- Error redoCommon slip: treating cleaning as the last stage. Which stage really comes last?
03 Answers and one-line notes
| # | Answer | One-line note |
|---|---|---|
| 1 | Volume. | Volume is about the amount of data; velocity is about how fast it arrives. |
| 2 | CCTV video. | Images and sound have no fixed fields, so they are unstructured. |
| 3 | Collect, clean, store, analyse, visualise. | Raw data is gathered first, cleaned before storage and analysis, and the result is presented last. |
| 4 | Extract, Transform, Load. | ETL is the standard routine before data enters a warehouse. |
| 5 | 200,000,000 bytes, that is 190.7 MB. | Multiply 1 000 000 by 200 for the byte total, then divide by 1 048 576 to get MB. |
| 6 | 150 GB. | Multiply the daily increase by the number of days. |
| 7 | 1,200,000,000 bytes, that is 1.12 GB. | Multiply for the byte total, then divide by 1 073 741 824. |
| 8 | 5,000 users. | Multiply the sampling fraction by the population and take the whole number. |
| 9 | Stream processing. | Stream processing handles each event as it arrives; batch processing waits for a whole batch. |
| 10 | Visualisation. | Cleaning belongs early; the last stage presents the results to decision makers. |
04 What to do after marking
- After marking, redo only the wrong items and write down which step went wrong (formula, unit, or misread number).
- Repeat the same item two days later; move to the next paper only when both attempts are correct.
- Parents only need the answer and note columns; there is no need to explain every item.
Download the full ten-item paper as a PDF, answers and notes included.Tutor Registration →
Questions and answers are written originally by the TutorZone team and are not taken from any school, publisher or examination authority paper. Every value is checked by computer.