S5 Maths Expectation and Variance (Mistake Review)

S5 Maths Expectation and Variance (Mistake Review)

  • 2026-11-23

S5 Maths Expectation and Variance (Mistake Review)

S5 Maths fixing common errors

S5 Maths fixing common errors S5 Maths fixing common errors

01 Paper details (check answers afterwards)

Item Detail
Questions 10 questions
Suggested time 25 minutes
Difficulty mix Error redo 10
Chapter Chapter: S3 Science – Wave Properties and the EM Spectrum
Level S5 . expectation mistakes

02 Questions (10 items)

  1. Error redoGiven Var(X) = 3, find Var(2X + 5). A student answers 11. What is correct?
  2. Error redoGiven Var(X) = 0.36, find the standard deviation. A student answers 0.36. What is correct?
  3. Error redoGiven E(X) = 2 and E(X squared) = 5, find Var(X). A student answers 3. What is correct?
  4. Error redoX is binomial with n = 20 and p = 0.3. Find the variance. A student answers 6. What is correct?
  5. Error redoX and Y have variances 4 and 9 but are not independent. Someone adds them to get 13. What is wrong?
  6. Error redoA discrete distribution lists probabilities 0.1, 0.2 and 0.3 with one value missing. How should it be handled?
  7. Error redoThe expected score of a fair die is 3.5. Someone says this must be wrong because 3.5 is impossible. What is correct?
  8. Error redoGiven E(X) = 5, find E(-2X). A student answers 10. What is correct?
  9. Error redoSomeone adds the standard deviations of three independent parts to get the standard deviation of the total. Is that right?
  10. Error redoWhen finding an expectation, someone multiplies each value by its frequency without dividing by the total. What is the right method?

03 Answers and one-line notes

# Answer One-line note
1 12. The factor must be squared: 4 x 3 = 12. Adding 5 to 2 x 3 is the common slip.
2 0.6. The standard deviation is the square root of the variance, so 0.6.
3 1. Subtract the square of the mean: 5 – 4 = 1.
4 4.2. The variance is n times p times (1 – p); 6 omits the factor 0.7.
5 The variances cannot simply be added unless the variables are independent. With dependence a covariance term appears, so 13 need not hold.
6 The missing probability is 0.4. Probabilities must total 1, so the missing one is 0.4.
7 Nothing is wrong: an expectation need not be an attainable value. The expectation is a long-run average, not a possible outcome.
8 -10. The factor keeps its sign: -2 x 5 = -10.
9 No: variances add, not standard deviations. Add the variances first, then take the square root.
10 Multiply each value by its probability and add. The probability already contains the division, so frequencies would inflate the result.

04 What to do after marking

  • After marking, redo only the wrong items and write down which step went wrong (formula, unit, or misread number).
  • Repeat the same item two days later; move to the next paper only when both attempts are correct.
  • Parents only need the answer and note columns; there is no need to explain every item.

Join our S5 Maths courseTutor Registration →

Questions and answers are written originally by the TutorZone team and are not taken from any school, publisher or examination authority paper. Every value is checked by computer.

Join as a tutor or coach — academic, music, sports, arts, STEM. Free to register. See how it works →