/en-tutor-prep-alevel-maths-normal-distribution-standardisation-inverse-binomial/
/en-tutor-prep-alevel-maths-normal-distribution-standardisation-inverse-binomial/
General Inquiry: info@TutorZone.com.hk
Office Hours: Monday to Saturday - 9:00 AM to 6:00 PM
WhatsApp Monday to Sunday - 24 hours
Hotline: +852 6828 1809
Instant Support: +852 9061 3106

A-Level Maths: Normal Distribution, Standardising and the Binomial Approximation (Tutor Guide)

A-Level Maths: Normal Distribution, Standardising and the Binomial Approximation (Tutor Guide)

  • 2026-11-29

Students know the formula but slip in three places: they substitute the variance 64 for the standard deviation, they forget which tail the table gives, and they approximate a binomial without a continuity correction. This lesson splits the topic into one model, two directions and one correction, each checked against the same set of figures.

Objectives — Students can: (1) name the two parameters and the symmetry of the normal model and write the full substitution into z equals (x minus mu) over sigma; (2) with mean 50 and standard deviation 8, get P(X below 62) equals 0.9332, P(X above 38) equals 0.9332 and P(X between 42 and 62) equals 0.7745; (3) invert P(X below k) equals 0.90 to k equals 60.25 and recover mu equals 59.75 from a 90 per cent tail; (4) justify the three approximation conditions for n equals 100 and p equals 0.4 and get a corrected P(X at most 35) equals 0.1792; (5) convert at most, less than, at least, more than and equals into the right boundary from the five-correction table.

01 Prerequisites (3-minute check)

If any of these fails, fix it before the lesson starts.

Skill Quick check Pass mark
Symmetry of the curve With mean 50, how do P(X below 42) and P(X above 58) compare? They are equal, since 42 and 58 mirror each other about 50
Meaning of a z score What does z equals 1.5 mean? One and a half standard deviations above the mean
Reading the table What is the entry for 1.50 and which area does it give? 0.9332, the area to the left of z
Binomial parameters With n equals 100 and p equals 0.4, what are the mean and variance? Mean 40, variance 24, standard deviation 4.899

02 Lesson flow (60 minutes)

Time Stage Tutor does Student does
0-6 min Entry check Ask whether 42 and 58 mirror each other, then what 1.50 gives Say symmetry and 0.9332
6-22 min Act 1: x to probability Standardise, sketch, three question shapes, and the 64 error Work out 0.9332, 0.7745 and 0.0228
22-38 min Act 2: probability to x, mu or sigma Reverse lookup, right tails, the middle 80 per cent, then solve for mu and sigma Get 60.25, 55.40, 39.75 and 59.75
38-52 min Act 3: the binomial approximation Three conditions, five corrections, four probabilities Get 0.1792, 0.0262 and 0.8532
52-57 min Question routines Fixed routines for six question types plus the sketch Do one question by the routine
57-60 min Exit check Three quick questions and homework Work independently

03 Teaching script (read it out)

Scene 1: One model, two directions, starting with x to probability

Open with the model, not the formula. A normal distribution is fixed by two numbers: the mean mu sets the centre and the standard deviation sigma sets the spread. Writing X follows N(50, 64) means mu is 50 and the variance is 64, so sigma is 8. That line is the first trap: given N(50, 64), many students substitute 64 as the standard deviation.
Standardising turns distance from the centre into a single yardstick: z equals (x minus mu) over sigma. For x equals 62, z is 12 over 8, which is 1.5, and the table gives 0.9332, so P(X below 62) is 0.9332. Now P(X above 38): z is (38 minus 50) over 8, which is minus 1.5, the left tail is 0.0668 and the right tail is 1 minus 0.0668, which is 0.9332, the same number by symmetry.
The third shape is a middle interval. For P(42 below X below 62) the z values are minus 1 and 1.5, giving 0.1587 and 0.9332, so the probability is 0.7745. Insist on a sketch first: shade the target area, then decide whether to read it directly, subtract from 1, or subtract two left tails. Shading the wrong side is the most common lost mark on a six-mark question.
Finally show the error: using 64 as sigma gives z equals 12 over 64, which is 0.1875, and a probability of 0.5744. Against the correct 0.9332 that is 35.9 percentage points out, so one wrong parameter destroys the whole question.
Students do: with the same parameters, find P(X above 66) and P(X below 34), and explain why the two answers agree.

Say this: “The second number inside the bracket is the variance; what you need is the standard deviation, so take the square root.”

Scene 2: The reverse direction: probability back to x, mu or sigma

Reverse lookup is where Paper 5 marks disappear, because the table only gives the left tail while questions hand you right tails and middles. Start with the basic move: if P(X below k) is 0.90, find 0.9000 in the body of the table, read z equals 1.2816, then k equals 50 plus 1.2816 times 8, which is 60.25. Write that z value on its own line, because the syllabus says the standardising work must be shown in full.
Then right tails. If P(X above k) is 0.25 the left tail is 0.75, so z is 0.6745 and k is 55.40. A student who looks up 0.25 directly gets z equals minus 0.6745 and then 44.60, the mirror image, and the answer looks plausible, which is why the sketch is compulsory.
The middle 80 per cent is the third shape: 10 per cent in each tail, so z is plus or minus 1.2816 and the bounds are 39.75 and 60.25.
Now replace the unknown with mu or sigma, which the syllabus demands explicitly. With sigma equal to 8 and P(X below 70) equal to 0.90, write 70 equals mu plus 1.2816 times 8, so mu equals 70 minus 10.25, which is 59.75. With mu equal to 50 and P(X above 45) equal to 0.20, the left tail is 0.80, z is 0.8416, and 45 equals 50 minus 0.8416 sigma, so sigma is 5 over 0.8416, which is 5.94. Both questions follow one routine: look up z, write x equals mu plus z sigma, then solve for the unknown.
Students do: with mu equal to 50, find k when P(X above k) is 0.10, and say how it relates to 60.25.

Say this: “The table only knows the left tail; when the question gives a right tail, subtract from one and sketch before you look up.”

Scene 3: Approximating a binomial: three conditions and five corrections

Start with why the approximation exists: for n equals 100, P(X at most 35) would need 36 binomial terms, which no exam expects, so the normal curve stands in. Three conditions: n is large, np is greater than 5 and nq is greater than 5. With n equals 100 and p equals 0.4, np is 40 and nq is 60, both well above 5, so the approximation applies, with mean 40, variance 40 times 0.6 equals 24, and standard deviation 4.899.
Give the counter-examples, because the conditions are examinable. With n equals 20 and p equals 0.05, np is 1 and the distribution is badly skewed, so the normal curve must not be used. With n equals 50 and p equals 0.1, np is exactly 5, and since the condition says greater than 5, a good answer notes the borderline and either uses the binomial or states the caveat.
Then the continuity correction, all five cases in one table: at most 35 uses 35.5; less than 35 uses 34.5; at least 50 uses 49.5; more than 50 uses 50.5; equals 40 uses the interval 39.5 to 40.5. The slogan is that each discrete value occupies a whole unit, so the boundary sits halfway.
Work four answers. For at most 35, z equals (35.5 minus 40) over 4.899, which is minus 0.9186, giving 0.1792, while the exact binomial value is 0.1795, a gap of 0.0003 that shows the approximation is sound. For at least 50, use 49.5, z equals 1.9392 and the probability is 0.0262. For 30 to 45 inclusive, use 29.5 and 45.5, giving 0.0160 and 0.8692, so the answer is 0.8532. For equals 40, use 39.5 to 40.5 and get 0.0813 against an exact 0.0812.
Close by explaining the half, not a whole: each integer occupies a segment of width 1, so the boundary lies midway between neighbouring integers.
Students do: write both the P(X above 60) and P(X at most 60) statements and say why their boundaries differ.

Say this: “The correction gives every integer its half unit; without it you have treated a count as a continuous measurement.”

04 Question types and worked steps

Type Example Steps Answer
x to a left-tail probability X follows N(50, 64), find P(X below 62) (1) state sigma equals 8 (2) standardise (3) read the table (4) name the area in words z equals 1.5, probability 0.9332
x to a right-tail probability P(X above 38) (1) standardise to minus 1.5 (2) left tail 0.0668 (3) subtract from 1 (4) check against the mirror value 0.9332, the same as P(X below 62)
A middle interval P(42 below X below 62) (1) two z values (2) two left tails (3) subtract (4) confirm the answer is below 1 0.9332 minus 0.1587, which is 0.7745
Probability to x P(X below k) equals 0.90, find k (1) find 0.9000 in the table body (2) read z (3) write k equals mu plus z sigma (4) substitute z equals 1.2816, k equals 60.25
Probability to mu or sigma sigma 8 with P(X below 70) equals 0.90; or mu 50 with P(X above 45) equals 0.20 (1) fix the left tail (2) read z (3) write the equation (4) solve the unknown mu equals 59.75; sigma equals 5.94
Binomial approximation n equals 100, p equals 0.4, find P(X at most 35) (1) check np and nq exceed 5 (2) compute mean and standard deviation (3) apply the correction (4) standardise and read z equals minus 0.9186, probability 0.1792 against an exact 0.1795
Sanity check (teach this): Four checks. First, every probability lies between 0 and 1, so a negative result from subtracting two left tails means the order was reversed. Second, the sign of z must match the position of x: above the mean gives a positive z, and a negative z there means the numerator was written the wrong way round. Third, check an inverse answer against the original distribution, since P(X below 60.25) should be about 0.90 and a value of 0.10 means the wrong tail was read. Fourth, the standard deviation of a binomial is the square root of npq, not np: with n equals 100 and p equals 0.4 it is 4.899, and using 40 shrinks z tenfold and pushes the answer towards 0.5, which is the tell-tale sign.

05 Independent practice (3 questions)

Question Answer What to watch
X follows N(80, 144). Find P(X below 92), P(X above 68) and P(74 below X below 92). sigma equals 12; z values 1, minus 1 and minus 0.5; 0.8413, 0.8413, and 0.8413 minus 0.3085 equals 0.5328 Take the square root for 12; every answer must match the sketch
X follows N(80, 144). Given P(X above k) equals 0.20, find k; then with P(X below 95) equals 0.90 and sigma 12, find mu. Left tail 0.80 gives z equals 0.8416 and k equals 80 plus 10.10, which is 90.10; mu equals 95 minus 1.2816 times 12, which is 79.62 Convert the tail first; recovering mu needs one linear equation only
With n equals 80 and p equals 0.3, approximate P(X at most 20) and P(X equals 24), and state whether the conditions hold. np equals 24 and nq equals 56, both above 5; standard deviation 4.098; using 20.5 gives z equals minus 0.8539 and 0.1966; using 23.5 to 24.5 gives 0.0971 against an exact 0.0970 Conditions, standard deviation and both corrections must appear; equals needs an interval

06 Common mistakes and what to say

Mistake Student writes Say this
Substituting the variance for the standard deviation z equals (62 minus 50) over 64, which is 0.1875 “The second number in the bracket is the variance; the standard deviation is its square root, so 8 not 64.”
Looking up a right tail directly P(X above k) equals 0.25, so 0.25 is read as z equals minus 0.6745 “The table only gives the left tail; 0.25 is on the right, so the left tail is 0.75 and z is plus 0.6745.”
Approximating a binomial without the correction Standardising 35 directly for P(X at most 35) “35 is a whole number occupying 34.5 to 35.5; without the half you treated a count as continuous.”
Using np as the standard deviation Writing a standard deviation of 40 when n is 100 and p is 0.4 “The mean is 40 and the standard deviation is the square root of 24, which is 4.899; 40 mixes the two.”

07 Homework (paper, section and question numbers)

08 Exit check (last 5 minutes)

Question Answer Decision
What is the standard deviation of N(50, 64)? 8, because 64 is the variance Answering 64 means the two parameters are retaught
What is z when P(X below k) equals 0.90? 1.2816 A wrong row or a negative answer means three inverse questions are redone
Which boundary does P(X at most 35) use when n is 100 and p is 0.4? 35.5 Answering 35 means the five corrections are retaught

09 Tutor FAQ

Why is P(X equals 40) not simply zero?

The normal distribution is continuous, so the probability of a single point is zero; when the question counts whole numbers it is really binomial and that integer occupies one unit, so 39.5 to 40.5 gives 0.0813 against an exact 0.0812. If the variable is genuinely continuous then zero is the right answer, so the first line must state which model is being used.

When should the probability be subtracted from one?

There is one rule: the table gives the area to the left of z. If the question gives a greater-than probability, convert to a left tail by subtracting from one; if it gives a middle, split the remainder equally. Sketches settle it every time, which is why the syllabus mentions sketching.

How should the 75 minutes of Paper 5 be allocated?

Paper 5 is 50 marks in 75 minutes, so about 1.5 minutes per mark. A question in this topic is usually worth 6 to 9 marks, which is 9 to 14 minutes. Write the three lines of standardising and the sketch at the start, so method marks survive an arithmetic slip, and move on if no z value has appeared after 15 minutes.

Find a tutor — freeTutor Registration →

A TutorZone lesson-prep guide. Written by the TutorZone team; questions and lesson flow are original and are not taken from any school or publisher material.

Join as a tutor or coach — academic, music, sports, arts, STEM. Free to register. See how it works →