Students start writing code the moment they see a question, so analysis and design feel like the teacher talking. This chapter pins the four stages to a 40 hour budget, then breaks a library system into 17 boxes so students see that decomposition exists for sharing work and testing pieces.
01 Prerequisites (3-minute check)
If any of these fails, fix it before the lesson starts.
| Skill | Quick check | Pass mark |
|---|---|---|
| Input and output | Is a coin entering a vending machine input or output? | Input; the can dropping out is output |
| Order matters | What is the difference between validate then store, and store then validate? | The order decides whether bad data reaches the store |
| Percentages | What is 25 per cent of 40 hours? | 10 hours |
02 Lesson flow (60 minutes)
| Time | Stage | Tutor does | Student does |
|---|---|---|---|
| 0-8 min | Four stages | Ask what must happen before coding | Analysis and design, each with real work |
| 8-18 min | Stages and time | Split a 40 hour project four ways | 6, 10, 14 and 10 hours |
| 18-30 min | Sub-systems | Break a library system to the third level | 4 sub-systems and 12 modules |
| 30-40 min | Four parts | Describe borrowing with inputs, processes, outputs, storage | All four, naming the tables updated |
| 40-50 min | Three tools | Draw a structure diagram and a flowchart for one problem | Say which one shows decisions |
| 50-60 min | Pseudocode format | Write 12 lines, 3 levels deep | The deepest line is 12 spaces in |
03 Teaching script (read it out)
Scene 1: Four stages – each one delivers something
Analysis means finding out what to build. Three jobs: abstraction, which removes detail that does not matter to the problem; decomposition of the problem; and writing the problem and its requirements down. Demonstrate with a canteen ordering system: after abstraction we do not care which cooker the kitchen uses, only the menu, the order, payment and collection. A requirement must be checkable, such as the total shows within 3 seconds. 3 of 24 requirements are vague, which is 12.5 per cent, and that vagueness costs 6 hours of rework later (demonstration figures).
Design means deciding how. The work is further decomposition, structure diagrams, flowcharts and pseudocode. Coding means writing it, and writing it in pieces: finish one module, feed it a few values, move on, which is iterative testing. Testing means testing the whole program with test data, not pressing a few keys.
The four stages form a loop, not a straight line. A failed test may send you back to coding for one line, or back to design for one decision. Pin the time with a 40 hour project: analysis 15 per cent is 6 hours, design 25 per cent is 10, coding 35 per cent is 14 and testing 25 per cent is 10. At 5 hours a day, design takes 2 days. That is the useful sum, because students assume coding is nine tenths of the work when it is about a third.
| Stage | Work | Demonstration | Numbers |
|---|---|---|---|
| Analysis | Abstraction, decomposition, stating the problem and requirements | 3 of 24 requirements are vague | 12.5 per cent, 6 hours of rework |
| Design | Further decomposition, structure diagrams, flowcharts, pseudocode | Break the design into 12 modules | 10 hours of design, 2 days at 5 hours |
| Coding | Write the program, testing each small piece | One module at a time, test as you go | Iterative testing, not test everything at the end |
| Testing | Test the whole program with test data | Normal, abnormal and boundary values | A failure sends you back to design or coding |
Students name the four stages with one job each, and say which stage is most expensive to skip, which is analysis.
Scene 2: Sub-systems and four parts – down to shareable work
Take a library system apart in front of the class. The top level is the whole system; the second level has four sub-systems, catalogue, loans, members and reports; the third level gives each of those three modules, so loans holds borrow, return and renew. The number of boxes is 1 plus 4 plus 12, which is 17. At 3 days a module, 12 modules is 36 days, and at 5 days a week that is 7.2 weeks. That number answers why we share the work: one person needs 7.2 weeks, four people need under two, provided the interfaces are agreed first.
Every part is described by four things: inputs, processes, outputs and storage. Borrowing, for example: the input is the member number and the book barcode; the process checks that the book is in, works out the due date and reduces the copies available; the output is a slip with the due date; the storage writes a loan record and updates the book record. Students forget storage most often, and then cannot answer where the data lives.
Decomposition has a price: interfaces must match, so if loans talks about copies available and the catalogue talks about status, they must be reconciled first; and too many levels means too much communication. Asked for the benefits, answer sharing, testing and reuse; asked for the risks, answer mismatched interfaces and integration cost.
Students describe returning a book with all four parts and name the two tables that must be updated.
Scene 3: Three design tools – each shows one thing
A structure diagram shows hierarchy: how many parts the system has and how each part divides. It runs top down, the boxes only mean contains, so it shows no order and no decisions. That makes it the tool for splitting work and estimating time, not for logic.
A flowchart shows sequence and decisions, with six standard shapes: flow line, process, subroutine, input output, decision and terminator. 3 decisions give 8 paths, so branches multiply fast and a subroutine box keeps the page readable.
Pseudocode shows the logic line by line, and the format must be learned: keywords in upper case such as IF, REPEAT and PROCEDURE; identifiers in Pascal case such as NumberOfPlayers; an arrow pointing left for assignment; DECLARE with a colon and a data type; 4 spaces per level of indentation, but THEN and ELSE indented only two; comments after two forward slashes. 12 lines 3 levels deep means the deepest line starts with 12 spaces. Marks are for logic, not syntax, but a sentence such as x is greater than y is not pseudocode and must be written with comparison symbols; an undeclared variable or a loop with no ending loses marks outright.
| Tool | What it shows | What it hides | When to use it |
|---|---|---|---|
| Structure diagram | Hierarchy: how many parts, and their parts | No sequence or decisions | Splitting work and estimating time |
| Flowchart | Sequence, decisions, input and output, six shapes | The diagram grows fast with branches | Explaining one process precisely |
| Pseudocode | Line by line logic, close to code but not tied to syntax | The whole shape is hard to see at once | Writing for a reader and for coding |
Students take one problem, a password entered three times, and say what the structure diagram, the flowchart and the pseudocode each carry.
04 Question types and worked steps
| Type | Example | Steps | Answer |
|---|---|---|---|
| Name the stage | Writing down which fields each screen shows | Match against the four lists of work | Analysis, because it is a requirement |
| Split the time | 40 hour project, testing at 25 per cent | Total times the percentage, then divide by the day | 10 hours, 2 days at 5 a day |
| Decompose | How many parts does an online shop need | Three levels down, then count the boxes | Catalogue, basket, payment and members, three modules each |
| Write pseudocode | Enter an age, repeat while below 0 or above 120 | REPEAT, INPUT, UNTIL with AND or OR | REPEAT INPUT Age UNTIL Age at least 0 AND Age at most 120 |
05 Independent practice (3 questions)
| Question | Answer | What to watch |
|---|---|---|
| A 40 hour project gives design 25 per cent at 5 hours a day. How many days is that? | 10 hours, which is 2 days | Check whether they took the percentage before dividing by the day |
| A system has 4 sub-systems of 3 modules each. How many boxes including the top level? | 17, that is 1 plus 4 plus 12 | Check whether they dropped the top box |
| 12 modules at 3 days each, 5 days a week. How many weeks? | 36 days, which is 7.2 weeks | Check whether they treated days as weeks |
06 Common mistakes and what to say
| Mistake | Student writes | Say this |
|---|---|---|
| Leaving testing to the end | Write every feature, then test once | Test each module as you finish it, so a failure points at one module instead of the whole program. |
| Coding during analysis | I work out the requirements as I code | Write the four parts, inputs, processes, outputs and storage, first; a missing part means rewriting the block. |
| Mixing up the two diagrams | The structure diagram shows the order of steps | A structure diagram shows hierarchy only; order and decisions need a flowchart, and the two answer different questions. |
| Pseudocode as English or as code | If the age is bigger than 120 then ask again | Upper case keywords, comparison symbols, an arrow for assignment and four space indentation, that is pseudocode. |
07 Homework (paper, section and question numbers)
- IGCSE Computer Science chapter index — All chapters for this subject
- Prep guide master index — Comparable chapters in other qualifications
- Redo this chapter — Three questions: design hours, box count, module weeks
08 Exit check (last 5 minutes)
| Question | Answer | Decision |
|---|---|---|
| Four stages | Analysis, design, coding, testing | Cannot say it, return to act one |
| Four parts of a module | Inputs, processes, outputs, storage | Cannot say it, return to the middle of act two |
| Three tools in one line | Structure shows hierarchy, flowchart shows order and decisions, pseudocode shows line logic | Cannot say it, return to act three |
09 Tutor FAQ
Why not analyse as you code?
Because change gets dearer the later it comes. 3 vague requirements out of 24 is 12.5 per cent, and fixing one during analysis means editing a sentence, while fixing it during coding means changing an interface, the storage and the tests, which is the 6 hour rework in the demonstration. Analysis also sets the boundary, saying what is out of scope before it grows.
Which diagram comes first, structure or flowchart?
Structure first. It divides the system into parts that can be shared out and decides who owns what; then each part gets a flowchart for its order and decisions. Drawn the other way round, a flowchart usually reveals halfway through that some steps belong to a different module.
How detailed should pseudocode be?
Detailed enough for another person to code from it, without going into syntax. The necessary parts are declarations with data types, assignment with a left arrow, upper case keywords, conditions written as comparisons, a loop with a clear ending condition, and four space indentation. Marks are for logic, so short and complete beats long with a missing ending condition.