IGCSE Geography | River processes and landforms prep guide (for tutors) | Basins, discharge, erosion, floods

IGCSE Geography | River processes and landforms prep guide (for tutors) | Basins, discharge, erosion, floods

  • 2026-11-26

Asked about rivers, students say water runs downhill and draw one curve, and a flood is simply heavy rain. This chapter uses one basin water budget, one discharge sum and one hydrograph to tie erosion, transport, landforms and flood control together.

Objectives — Students should be able to: (1) close a basin water budget, 1,200 square kilometres at 1,400 millimetres giving 1,680,000,000 cubic metres a year, of which 30 per cent runs off as 504,000,000 cubic metres, a mean discharge of 16.0; (2) compute discharge, a channel 18 metres wide and 2.5 metres deep giving 45 square metres, at 1.2 metres a second, 54.0 cubic metres a second, with a wetted perimeter of 23 metres and a hydraulic radius of 1.96; (3) use a 30 millimetre storm to show 18 millimetres infiltrating, 60.0 per cent, against 12 millimetres of overland flow, 40.0 per cent, falling to 4 millimetres or 13.3 per cent when urbanised; (4) compare long profiles, 1,200 metres over 240 kilometres giving 5.0 metres a kilometre against 0.33 downstream, a factor of 15.0; (5) read a hydrograph, a rural peak of 48 after 8 hours against an urban peak of 78 after 3 hours, 30.0 per cent above bankfull at 60; (6) compare flood schemes, a dam at 480,000,000 returning in 8.0 years, embankments at 120,000,000 in 6.7, and a warning system at 3,000,000 a year against 9,000,000 saved, a ratio of 3.0.

01 Prerequisites (3-minute check)

If any of these fails, fix it before the lesson starts.

Skill Quick check Pass mark
Area and volume 1,200 square kilometres at 1,400 millimetres of rain a year Computes 1,680,000,000 cubic metres
Percentages Thirty per cent of that total Computes 504,000,000 cubic metres
Cross sections A channel 18 metres wide and 2.5 deep at 1.2 metres a second Computes 45 square metres and 54 cubic metres a second

02 Lesson flow (60 minutes)

Time Stage Tutor does Student does
0-6 min Opening probe When does rain upstream arrive downstream, and why does it flood, answers kept Writes a judgement with a reason
6-18 min Basin and cycle 1,680,000,000 in, 504,000,000 running off, 16.0 mean discharge Computes the budget and fills ten processes
18-30 min Discharge and erosion 45 square metres at 1.2 gives 54.0; four erosion and four transport ways Computes discharge and sorts the load
30-42 min Landforms 5.0 against 0.33 metres a kilometre; a 200 metre gorge needs 2,000 years Draws the profile and matches three landforms
42-52 min Hydrographs Lag 8 hours rural, 3 urban; peak up 62.5 per cent Draws both lines and explains
52-60 min Flood control and exit Dam 8.0 years, embankment 6.7, warning ratio 3.0 Compares schemes and answers three

03 Teaching script (read it out)

Scene 1: A basin is a water budget: do the arithmetic first

A drainage basin is the land that collects rain for one river and its tributaries, bounded by the watershed. Ten processes move that water: precipitation, interception by vegetation, infiltration, percolation, overland flow, throughflow, groundwater flow, channel flow, transpiration and evaporation. Each is a step in a pathway, so the answer should trace routes rather than list words.
The budget closes with one multiplication: 1,200 square kilometres is 1,200 million square metres, annual rainfall of 1,400 millimetres is 1.4 metres, and the product is 1,680,000,000 cubic metres. Of that, 30 per cent becomes runoff, 504,000,000 cubic metres, with the rest evaporated or stored underground. Dividing 504,000,000 by the 31,536,000 seconds in a year gives a mean discharge of 16.0 cubic metres a second.
Split one storm: of 30 millimetres, 18 infiltrate, 60.0 per cent, and 12 run over the surface, 40.0 per cent. Pave the same basin and infiltration falls to 4 millimetres, 13.3 per cent, while overland flow rises to 26 millimetres, 86.7 per cent.
Block the errors at once: multiplying millimetres by square kilometres without converting; treating runoff as the whole of rainfall; and confusing discharge in cubic metres a second with a volume in cubic metres.
Students do: compute the rainfall, runoff and mean discharge, then draw the ten processes as a pathway. Students say: 1,680,000,000, 504,000,000 and 16.0.

The rainfall, runoff and discharge are right, and the urban change in infiltration is stated.

Scene 2: Discharge, erosion and transport: one sum carries three landforms

Discharge is cross-sectional area times velocity. Here the channel is 18 metres wide and 2.5 metres deep, 45 square metres, at 1.2 metres a second, so 54.0 cubic metres a second. The wetted perimeter is the water in contact with bed and banks, 18 plus twice 2.5, 23 metres, and the hydraulic radius is area over perimeter, 45 over 23, 1.96 metres, which compares channels of different shape.
Erosion works four ways: hydraulic action prises rock out under pressure, abrasion grinds the bed with load, attrition rounds the load against itself, and solution dissolves limestone. Transport also has four modes: traction rolls the largest material, saltation bounces smaller pieces, suspension carries fine sediment in the flow, and solution carries dissolved load. Deposition reverses in order, because the coarsest material drops first when velocity falls.
The long profile explains where each process dominates: the source sits 1,200 metres up over 240 kilometres, 5.0 metres a kilometre, against 0.33 downstream, a factor of 15.0. So the upper course cuts down into V-shaped valleys, waterfalls and potholes, the middle course erodes sideways into meanders, and the lower course deposits floodplain and delta.
A waterfall forms where a hard band caps softer rock: the soft rock wears back, the cap collapses, and the fall retreats upstream. At 0.1 metres a year, a gorge 200 metres long is 2,000 years of retreat. A meander wavelength runs about ten channel widths, 18 metres giving 180 metres, and a cut neck leaves an oxbow lake.
Students do: compute discharge, wetted perimeter and hydraulic radius, then draw a long profile with three landforms marked. Students say: 54.0, the factor of 15.0 and 2,000 years.

Discharge, wetted perimeter and hydraulic radius are right, and each landform is matched to its process.

Scene 3: Floods and management: the hydrograph settles it

A hydrograph plots discharge against time and is read with three numbers: baseflow of 12, peak discharge, and lag time from the rain peak to the flow peak. A rural basin peaks at 48 after 8 hours, only 80.0 per cent of bankfull discharge of 60. Urbanised, it peaks at 78 after 3 hours, 30.0 per cent above bankfull, with a peak 62.5 per cent higher and a lag 2.7 times shorter.
The cause is sealed ground: infiltration falls from 60.0 to 13.3 per cent, almost all rain becomes overland flow, and drains deliver it fast, so the flood arrives higher and sooner. Natural controls add storm intensity, saturated soil, slope, basin shape and vegetation.
Flood control is compared, not listed. A dam costs 480,000,000 and saves 60,000,000 a year, paying back in 8.0 years; spread over 60 years the annual cost is 8,000,000, a net 52,000,000. Embankments cost 120,000,000 for 18,000,000 a year, 6.7 years, 4,800,000 over 25 years, a net 13,200,000. A warning system costs 3,000,000 a year against 9,000,000 saved, a ratio of 3.0.
Each has a price: a reservoir drowns land upstream and traps silt that would have fed the delta; embankments confine the river so a breach is worse; warning moves people and property but not water; wetland restoration and planting are soft options, cheap but slow. Pollution splits into industrial, agricultural and sewage sources, answered by regulation, treatment and buffer strips.
Students do: draw both hydrographs, compute payback and annual net benefit for three schemes, and name one cost each. Students say: 78, 30.0 per cent and the ratio 3.0.

Both hydrographs and all three costings are right, with one cost named per scheme.

04 Question types and worked steps

Type Example Steps Answer
Basin budget 1,200 square kilometres, 1,400 millimetres, 30 per cent runoff Convert to metres, multiply by area, take the runoff share, divide by seconds 1,680,000,000, 504,000,000, 16.0
Channel discharge 18 metres wide, 2.5 deep, 1.2 metres a second Area times velocity; perimeter and hydraulic radius separately 45 square metres, 54.0, radius 1.96
Hydrograph Rural peak 48, urban 78, bankfull 60 Percentage above bankfull, then compare peak and lag 30.0 per cent over, peak up 62.5, lag 8 to 3
Flood costing A dam at 480,000,000 saving 60,000,000 a year Cost over annual benefit, then spread over the design life 8.0 years, net 52,000,000 a year
Sanity check (teach this): Reasonableness: millimetres must become metres before multiplying area, since 1,400 millimetres is 1.4 metres and 1,200 square kilometres times 1.4 gives 1,680,000,000 cubic metres, while using 1,400 overstates by a thousand. Runoff is part of rainfall, 1,680,000,000 times 30 per cent is 504,000,000, and using all rainfall would give 53 cubic metres a second. Discharge divides by 31,536,000 seconds, not by 365. Area times velocity needs matching units, 45 times 1.2 is 54.0. Lag is measured from the rain peak to the flow peak, and the 8 and 3 hours are a difference, not a sum. Payback divides cost by annual benefit, 480,000,000 over 60,000,000 is 8.0, while using net benefit gives 9.2. Annualising divides by the design life, and a 60 year dam and a 25 year embankment cannot be ranked on payback alone.

05 Independent practice (3 questions)

Question Answer What to watch
Calculation A basin of 1,200 square kilometres, 1,400 millimetres of rain and 30 per cent runoff: rainfall, runoff and mean discharge Millimetres to metres, times area, times the runoff share, divided by seconds 1,680,000,000, 504,000,000, 16.0
Calculation A channel 18 metres wide and 2.5 deep at 1.2 metres a second: discharge and hydraulic radius Area times velocity; perimeter is width plus twice depth 54.0, radius 1.96
Calculation A dam at 480,000,000 saving 60,000,000 a year over 60 years: payback and annual net benefit Cost over benefit; cost over life, then subtract 8.0 years, net 52,000,000

06 Common mistakes and what to say

Mistake Student writes Say this
Millimetres multiplied by square kilometres 1,200 times 1,400 is 1,680,000 cubic metres Convert first: 1,400 millimetres is 1.4 metres, times 1,200 gives 1,680,000,000.
Rainfall treated as runoff All 1,680,000,000 cubic metres reaches the river Only 30 per cent runs off: 504,000,000 cubic metres, or 16.0 cubic metres a second.
Floods explained by rain alone It flooded because it rained hard Add the surface: infiltration falls from 60.0 to 13.3 per cent, lag shortens from 8 to 3 hours and the peak rises 62.5 per cent.
Flood schemes ranked on payback only Embankments pay back in 6.7 years, so they beat the dam at 8.0 Lives differ: the dam costs 8,000,000 a year and nets 52,000,000, the embankment 4,800,000 and 13,200,000, before drowned land and trapped silt.

07 Homework (paper, section and question numbers)

08 Exit check (last 5 minutes)

Question Answer Decision
One number 1,680,000,000 in, 504,000,000 out, 16.0 mean discharge If not, redo the first scene
One sum 45 square metres at 1.2 is 54.0 If not, redo the second scene
One comparison Urban lag 3 against rural 8 hours, peak up 62.5 per cent If not, redo the third scene

09 Tutor FAQ

Students mix discharge with volume, what fixes it?

Ask for the unit: cubic metres is how much, cubic metres a second is how fast. 504,000,000 cubic metres a year over 31,536,000 seconds is 16.0.

How many landforms must be memorised?

Seven cover it: V-shaped valley, waterfall and gorge, potholes, meander, oxbow lake, floodplain and delta, each with a course and a process. Meander wavelength is about ten channel widths, 18 metres giving 180.

Must flood control mean a dam?

No. A dam pays back in 8.0 years but drowns land and traps silt; embankments in 6.7 but breach risk is higher; warning returns 3.0 times at the lowest cost. Choose by people and land value.

Find a tutor — freeTutor Registration →

A TutorZone lesson-prep guide. Written by the TutorZone team; questions and lesson flow are original and are not taken from any school or publisher material.

Join as a tutor or coach — academic, music, sports, arts, STEM. Free to register. See how it works →