IGCSE ICT | Systems Life Cycle and Analysis: five stages, testing and changeover

IGCSE ICT | Systems Life Cycle and Analysis: five stages, testing and changeover

  • 2026-11-25

Students hear systems development and think of writing code, yet the exam asks about analysis, testing and changeover. This chapter splits the cycle into five stages with a named deliverable each, then turns payback, parallel running cost and test coverage into calculations.

Objectives — Students should be able to: (1) name the deliverable of each of the five stages and separate the four fact-finding methods; (2) compare changeover methods with numbers, where development costs 180,000 dollars, annual net saving is 42,000 dollars and payback is 4.3 years, parallel running adds 3 months at 9,000 a month for 27,000 dollars, a pilot starts with 10 percent of 480 users or 48 people, and 4 modules over 4 phases of 5 weeks take 20 weeks; (3) answer on test coverage, where 4 fields times 3 data classes give 12 cases and ages 11 to 18 are valid while 10 and 19 sit outside; (4) quantify benefits, where 120 orders fall from 6 minutes to 2 minutes each, from 12 hours to 4 hours a day, saving 8 hours or 960 dollars a day and 240,000 dollars over 250 working days.

01 Prerequisites (3-minute check)

If any of these fails, fix it before the lesson starts.

Skill Quick check Pass mark
System inputs and outputs When you log in to a school system, what does it take and what does it give? It takes a name and password as input and gives a timetable as output
Data against information Which is data: a list of marks or a report card? The marks are data and the report card is organised information
Percentages A system costs 180,000 dollars and saves 42,000 a year: how long to pay back? Divide, which gives about 4.3 years

02 Lesson flow (60 minutes)

Time Stage Tutor does Student does
0-8 min Opening question Ask where a school system change usually goes wrong and collect answers Write a prediction to check at the end
8-20 min Five stages and fact finding Each stage with its deliverable, four methods with four settings State the analysis deliverable
20-34 min Requirements and testing Functional against non-functional, four test levels, three data classes Design three test cases
34-46 min Four changeover methods Direct, parallel, phased and pilot by risk and cost, with the parallel sum Choose one with two reasons
46-56 min Payback and documentation Work the payback and hours saved, then technical against user documents Work a payback figure
56-60 min Exit check Two questions marked at once, naming the stage, test or changeover gap Work independently

03 Teaching script (read it out)

Scene 1: Five stages and fact finding: deliverables first, methods second

Break one misconception first: the life cycle is not writing code, and code appears only in the third stage. Take the five stages with a deliverable each, and make students name what is in hand when the stage closes. Analysis closes with a requirements specification that says what the system must do; design closes with input and output screens, file structures and flowcharts; development and testing closes with a working system and test records; implementation closes with a live system and migrated data; evaluation closes with a report against the specification. Match the four fact-finding methods to four settings: a questionnaire suits many people with closed questions, as when 400 students are surveyed, 320 reply for 80.0 percent, 24 are incomplete, and 296 remain valid at 74.0 percent; an interview suits follow-up detail but reaches few people; observation shows the real process, because what people say and what they do differ; document review uses existing forms, manuals and reports at low cost but may be out of date. One sentence for students: the questionnaire gives breadth, the interview depth, observation truth and documents history. Feasibility takes five angles: technical, economic, legal with personal data rules, operational as whether staff will use it, and schedule as whether it lands before term starts.
Student task: pick two fact-finding methods for a library loans system with one reason and one limit each. Student talk: state that analysis ends with a requirements specification, not with code.

The scene is secure when all five deliverables are named and the two methods fit the setting.

Scene 2: Requirements, design and testing: write what can be checked

Requirements split in two: functional requirements say what the system does, such as reducing the loan count on issue, while non-functional requirements say quality, such as every screen responding within two seconds for 480 users. Both must be written so a test can pass or fail. Design covers inputs with fields, formats and validation, outputs as reports and screens, data storage as files and relationships, process as flowcharts or data flow diagrams, and the interface as buttons and prompts. Testing runs small to large: unit testing checks one function, integration testing checks data passing between modules, system testing checks the whole against requirements, and acceptance testing has users work a real day. Test data always comes in three classes: normal data such as age 15, boundary data where 11 and 18 are accepted and 10 and 19 rejected, and abnormal data such as text, blanks and negatives. 4 fields times 3 classes give 12 cases as a floor rather than a ceiling. One sentence for students: testing does not prove a system correct, it locates faults, which is why boundary and abnormal data earn the marks. Documentation splits as well: technical documentation serves maintenance with structure, file formats, installation and recovery steps, while user documentation serves daily operators with steps, error messages and help routes.
Student task: write normal, boundary and abnormal data for an age field of 11 to 18. Student talk: state that boundary data catches most faults because normal data was tried first.

Six test values are written and correctly classified, with 11 and 18 included as boundaries.

Scene 3: Changeover, payback and evaluation: choose with numbers

Teach the four changeover methods by risk and cost together. Direct changeover stops the old system on one day and starts the new one, which is fastest and cheapest yet a failure halts the whole organisation, so it suits small or low-risk systems. Parallel running keeps both live with data entered twice, so the old system catches failures, at the highest cost: here 3 months at an extra 9,000 a month costs 27,000 dollars. Phased changeover goes live module by module or department by department, so 4 modules over 4 phases of 5 weeks take 20 weeks, spreading risk while both systems coexist and interfaces must join. Pilot changeover starts with a small group, here 10 percent of 480 users or 48 people, then rolls out, giving the lowest risk at the longest rollout with extra support for the pilot group. Payback carries the economics: development at 180,000 dollars against 54,000 of savings less 12,000 of maintenance gives 42,000 net, so payback is 180,000 over 42,000 or 4.3 years. Benefits can also be counted in hours: 120 orders fall from 6 to 2 minutes each, from 12 to 4 hours a day, saving 8 hours or 960 dollars a day and 240,000 dollars over 250 days. Evaluation walks the specification item by item: functions met, measured non-functional figures, user satisfaction and remedies for gaps. One evaluative line: a 4.3-year payback only works inside the system life, so a three-year life forces a rethink.
Student task: choose one changeover method for a 1,200-student results system with two reasons and one risk. Student talk: state that parallel running buys safety with money while direct changeover buys time with risk.

The scene is secure with 4.3 years, 27,000 dollars, 48 users and one named changeover risk.

04 Question types and worked steps

Type Example Steps Answer
Payback Development 180,000 and annual net saving 42,000 Development cost over annual net saving 4.3 years
Parallel cost Three months at an extra 9,000 a month Months times monthly extra cost 27,000 dollars
Pilot size 480 users with a 10 percent pilot Users times the percentage 48 users
Test cases Four fields with three data classes each Fields times data classes 12 cases
Sanity check (teach this): Sanity checks: payback is positive and divides by net saving, so using gross saving understates the years. Parallel cost rises with months, and a figure above the development cost means the sum counted total running cost rather than the extra. A pilot is part of the user base, so 10 percent of 480 is 48 rather than 480. Test cases equal fields times classes, so four fields and three classes give 12 rather than 7. A valid response rate sits below the return rate, so 74 percent valid against 80 percent returned is normal and the reverse is an error. Data size comes from record size times records, so 45,000 records at 2 KB give 90,000 KB or about 87.9 MB, and 90 GB means the units slipped.

05 Independent practice (3 questions)

Question Answer What to watch
Calculation Development 240,000, annual saving 60,000 and maintenance 15,000: find the payback Net the saving first, then divide 5.3 years
Calculation Parallel running for four months at 7,500 extra a month: find the extra cost Months times the monthly extra 30,000 dollars
Calculation 500 questionnaires sent, 410 returned and 25 spoilt: find the valid response rate Valid returns over questionnaires sent 77.0 percent

06 Common mistakes and what to say

Mistake Student writes Say this
Treating the cycle as coding Saying the job is to hire a programmer and go live when the code is done Code is part of stage three only; analysis produces the specification, and testing and changeover have their own deliverables.
Using gross saving for payback Dividing 180,000 by 54,000 to claim 3.3 years Deduct maintenance first: 54,000 less 12,000 is 42,000, so payback is 4.3 years and gross saving flatters it.
Testing normal data only Saying the field works because age 15 was accepted Boundaries and abnormal values catch faults: 11 and 18 must pass, 10 and 19 must fail, and text must raise an error.
Calling parallel running cheap Claiming two systems running together is safe and free Parallel running enters every record twice and costs the most; it buys safety rather than savings.

07 Homework (paper, section and question numbers)

08 Exit check (last 5 minutes)

Question Answer Decision
One order Analysis, design, development and testing, implementation, evaluation A wrong order sends scene one back
One formula Payback is development cost over annual net saving Using gross saving sends scene three back
One difference Technical documents serve maintenance, user documents serve operators A miss sends scene two back

09 Tutor FAQ

How does pilot changeover differ from phased?

A pilot starts with a share of users, such as 48 of 480, while a phased rollout goes module by module or department by department, and the two can combine.

Why write non-functional requirements?

Because working is not the same as fast or reliable: concurrency, response time, availability and security need measurable targets or acceptance has no standard.

What follows from poor documentation?

Maintenance fails: new staff cannot read the structure and faults have no recovery steps, so the system is rewritten and the saved effort is paid twice.

Find a tutor — freeTutor Registration →

A TutorZone lesson-prep guide. Written by the TutorZone team; questions and lesson flow are original and are not taken from any school or publisher material.

Join as a tutor or coach — academic, music, sports, arts, STEM. Free to register. See how it works →