S4 Geography: River Hydrographs, Discharge and Lag Time, from 60 millimetres of rain to 5.25 million cubic metres (worked example) Tutor Prep Guide with a 45-minute plan
- 2026-11-16
Students look at a hydrograph and can only say the line goes up and then down. Asked for the peak, the lag time, or why the urban curve is taller and narrower, they have nothing. They treat discharge and rainfall as the same quantity and cannot tell which part of the curve is surface runoff and which is baseflow. This lesson works one 250 square kilometre catchment from the rainfall arithmetic through the graph to an urban comparison built on the same numbers.
01 Prerequisites (3-minute check)
If any of these fails, fix it before the lesson starts.
| Skill | Quick check | Pass mark |
|---|---|---|
| Runoff coefficient | What does 0.35 mean for the share of rain that becomes runoff | About a third, with the rest infiltrating, evaporating or intercepted |
| Units | How many litres of rain fall on one square metre from 60 millimetres | 60 litres, or 0.06 cubic metres |
| Discharge | What does 180 cubic metres per second mean | 180 tonnes every second, about a third of an Olympic pool each minute |
| Area | How many square metres are in 250 square kilometres | 250 million square metres |
02 Lesson flow (45 minutes)
| Time | Stage | Tutor does | Student does |
|---|---|---|---|
| 0-6 min | Entry check | Where rain goes after landing, what a coefficient of 0.35 means, whether discharge and rainfall are the same thing | Spoken answers written into two columns |
| 6-18 min | Act one: rainfall to runoff volume | 60 millimetres times 250 square kilometres is 15 million cubic metres, times 0.35 is 5.25 million | Students work the calculator and write both volumes |
| 18-30 min | Act two: three numbers on the graph | Baseflow 20, peak 180, lag from a rainfall peak at hour 3 to a discharge peak at hour 11, so 8 hours | Students mark all three and write how each is measured |
| 30-40 min | Act three: rural against urban | Coefficient 0.35 to 0.70, volume 5.25 to 10.5 million, lag 8 to 4 hours, peak 180 to 320 | Students name three causes and two consequences |
| 40-43 min | Fresh numbers | Same catchment, 90 millimetres of rain, coefficient 0.35: find the runoff volume | 7.875 million cubic metres while circulating |
| 43-45 min | Exit check | Three spoken questions: the coefficient, the lag measurement, the urban effects | All three correct |
03 Teaching script (read it out)
Scene 1: Act one: rainfall is the input, runoff is what the channel actually receives
Compute 15 million and 5.25 million cubic metres and show where the coefficient sits in the working.
Scene 2: Act two: a hydrograph only needs three numbers, baseflow, peak and lag
Point to the rainfall peak, the discharge peak and the baseflow line on the graph, then state which two moments give the lag.
Scene 3: Act three: urbanisation turns the same storm into a taller, narrower graph
Write the three features of the urban curve, taller, narrower and earlier, each with one cause.
04 Question types and worked steps
| Type | Example | Steps | Answer |
|---|---|---|---|
| Runoff volume | 60 millimetres, coefficient 0.35, 250 square kilometres: find the volume | Rainfall in metres times area times the coefficient | Forgetting the coefficient and answering 15 million |
| Graph reading | Find the peak, the baseflow and the lag | Peak at the highest point, baseflow on the pre-storm line, lag from peak to peak | Measuring the lag from the first rain and answering 5 hours |
| Peak ratio | Find the ratio of peak to mean excess flow | Remove the baseflow first, then divide over the storm duration | Leaving the baseflow inside the peak |
| Urbanisation | Compare rural and urban curves | Coefficient up, lag down, peak up, all three | Saying only that there is more water |
05 Independent practice (3 questions)
| Question | Answer | What to watch |
|---|---|---|
| Volume | 90 millimetres, coefficient 0.35, 250 square kilometres | Whether the rainfall was converted to metres |
| Graph | Mark the peak, baseflow and lag | Whether the lag starts at the rainfall peak |
| Peak ratio | Divide 180 by 60.76 | Whether the baseflow was removed |
| Urbanisation | Write three features and three causes | Whether impermeable surfaces and drains are named |
06 Common mistakes and what to say
| Mistake | Student writes | Say this |
|---|---|---|
| Omitting the coefficient | Answering 15 million cubic metres of runoff | Fifteen million is the rainfall total, and the channel does not collect all of it. Infiltration, evaporation and interception come off first, so 0.35 gives 5.25 million. Answering 15 million claims the hillside absorbs nothing. |
| Wrong lag start | Answering a lag of 5 hours | The lag is the gap between the rainfall peak and the discharge peak, hour 3 to hour 11, which is 8 hours. Measuring from the end of the storm at hour 6 answers a different question. |
| Baseflow left inside | Answering a peak of 200 or a ratio of 3.3 | The 180 on the graph already includes the 20 of baseflow, so the excess peak is 160. Be consistent: strip it from both sides or from neither, never one. |
| Urbanisation without timing | Answering that cities flood because there is more water | The point is not only more, it is faster. The urban runoff is 10.5 million cubic metres with a lag of 4 hours and a peak of 320, so the channel cannot drain in time. Name taller, narrower and earlier. |
07 Homework (paper, section and question numbers)
- Secondary Geography prep guides — All chapters for the subject
- Tutor prep guide index — Similar chapters in other subjects
- Redo this chapter — Practice questions 1, 2 and 4: volume, graph reading and urbanisation
08 Exit check (last 5 minutes)
| Question | Answer | Decision |
|---|---|---|
| Runoff volume | 60 millimetres times 250 square kilometres times 0.35 is 5.25 million cubic metres | Answering 15 million means act one |
| Lag time | Hour 11 minus hour 3 is 8 hours | Starting at the first rain means act two |
| Urban effects | Coefficient 0.70, lag 4 hours, peak 320 | Only saying more water means act three |
09 Tutor FAQ
Do students memorise a runoff coefficient?
No single value, but they should know rural land is roughly 0.2 to 0.4 and urban land can reach 0.7 to 0.9, and explain the gap with impermeable cover.
How is return period calculated?
By the Weibull expression, record years plus one divided by rank. The largest flood in 20 years is a 21 year event and the third largest is 7 years, an expected frequency rather than a guarantee.
Why teach the peak ratio?
It turns the shape of a hydrograph into a number, and the urban consequence is precisely a larger peak ratio, which compares better than repeating the words taller and narrower.
Find a tutor — freeTutor Registration →
A TutorZone lesson-prep guide. Written by the TutorZone team; questions and lesson flow are original and are not taken from any school or publisher material.