Ten items start from service models and hypervisor types, then cover VM counts, image capacity, monthly cost and downtime from an availability figure.
Service models and basic capacity sums Know who runs what in IaaS, PaaS and SaaS, multiply before dividing, and keep units consistent.
01 Paper details (check answers afterwards)
| Item | Detail |
|---|---|
| Questions | 10 |
| Suggested time | 25 |
| Difficulty mix | Foundation 4 · Intermediate 2 · Challenge 2 · Error redo 2 |
| Chapter | Chapter: S4 ICT: cloud computing and virtualisation |
| Level | Basic |
02 Questions (10 items)
- FoundationRenting a virtual machine from a cloud provider and installing the OS and applications yourself is which service model?
- FoundationA hypervisor installed straight on bare-metal hardware, with no host OS underneath, is which type?
- FoundationEach VM image is 50 GB. How many GB do eight images take?
- FoundationA host has 8 vCPUs and each VM is given 2 vCPUs. How many VMs can four hosts run?
- IntermediateA 99.9% uptime commitment over 8,760 hours a year allows how many hours of downtime?
- IntermediateBilling is $0.12 per hour. What does one VM cost for a 730-hour month?
- ChallengeA bank must keep customer data in its own data centre but still wants cloud-style management. Which deployment model fits?
- ChallengeWhat is a virtual machine snapshot mainly for?
- Error redoError check: 64 vCPUs were divided by nothing, giving 64 VMs instead of 2 vCPUs per VM. What is correct?
- Error redoError check: SaaS was treated as something where you install and patch the OS. What does a SaaS user actually manage?
03 Answers and one-line notes
| # | Answer | One-line note |
|---|---|---|
| 1 | IaaS (Infrastructure as a Service). | The provider supplies compute, storage and network only; everything above the OS is your responsibility. |
| 2 | Type 1, a bare-metal hypervisor. | Type 2 runs on top of an existing OS and is mostly used in desktop test setups. |
| 3 | 400 GB. | 50 times 8 gives 400; allow extra room for snapshots when planning. |
| 4 | 16 VMs. | 8 divided by 2 gives 4 per host, then multiply by four hosts. |
| 5 | 8.76 hours. | 8,760 times 0.1% is 8.76 hours. |
| 6 | $87.60. | 0.12 times 730 gives 87.6. |
| 7 | A private cloud, or the private part of a hybrid cloud. | Public clouds are multi-tenant, which makes local data-residency rules hard to meet. |
| 8 | It records the disk state at one moment so you can roll back quickly around an update. | A snapshot lives on the same storage, so it is not a substitute for an off-site backup. |
| 9 | 32 VMs. | Divide 64 by 2 to get 32. |
| 10 | Only accounts, permissions and data; the provider runs the OS and the application. | Ready-to-use services such as webmail and online calendars are SaaS. |
04 What to do after marking
- After marking, redo only the wrong items and write down which step went wrong (formula, unit, or misread number).
- Repeat the same item two days later; move to the next paper only when both attempts are correct.
- Parents only need the answer and note columns; there is no need to explain every item.