/en-tutor-prep-s4-ict-cloud-computing-virtualisation-practice-3/
/en-tutor-prep-s4-ict-cloud-computing-virtualisation-practice-3/
General Inquiry: info@TutorZone.com.hk
Office Hours: Monday to Saturday - 9:00 AM to 6:00 PM
WhatsApp Monday to Sunday - 24 hours
Hotline: +852 6828 1809
Instant Support: +852 9061 3106

S4 ICT Cloud Computing and Virtualisation Practice 3 (Challenge)

S4 ICT Cloud Computing and Virtualisation Practice 3 (Challenge)

  • 2026-11-18

S4 ICT Cloud Computing and Virtualisation Practice 3 (Challenge)

Ten items cover container density, three-replica storage cost, downtime loss, IOPS limits, large upload duration, consolidation savings and a three-year cost comparison.

Capacity planning and total cost comparison Unify units before multiplying, and list one-off and yearly spending separately in a total cost sum.

01 Paper details (check answers afterwards)

Item Detail
Questions 10
Suggested time 25
Difficulty mix Foundation 4 · Intermediate 2 · Challenge 2 · Error redo 2
Chapter Chapter: S4 ICT: cloud computing and virtualisation
Level Challenge

02 Questions (10 items)

  1. FoundationA node has 64 GB of memory and each container uses about 512 MB. How many containers fit in theory?
  2. Foundation200 GB is replicated three times across regions. How much storage is used, and what is the monthly cost at $0.02 per GB?
  3. FoundationEach minute of downtime costs $500 and an incident lasts 45 minutes. What is the loss?
  4. FoundationEach VM needs 800 IOPS at peak and the storage array delivers 20,000 IOPS. How many VMs can it host safely?
  5. IntermediateA 500 GB backup is uploaded at 100 Mbps. How many seconds and roughly how many hours?
  6. IntermediateTwenty servers at 300 W each are consolidated onto four. By what percentage does power drop?
  7. ChallengeOn-premises hardware costs $60,000 up front plus $27,000 a year; the cloud option is $4,200 a month. After three years which is cheaper and by how much?
  8. ChallengeWhat are the billing and scaling traits of a serverless architecture?
  9. Error redoError check: a 500 GB transfer at 100 Mbps was answered as 5,000 seconds with the factor of 8 missing. What is correct?
  10. Error redoError check: 1 TB was billed as 1,000 GB. How many GB does that differ from 1,024 GB?

03 Answers and one-line notes

# Answer One-line note
1 128 containers. 64 times 1,024 gives 65,536 MB, then divide by 512.
2 600 GB, $12.00. Three copies means 3 times 200, then multiply by 0.02.
3 $22,500. 500 times 45 is 22,500, which cross-region redundancy can reduce.
4 25 VMs. 20,000 divided by 800 is 25, before counting any other workload.
5 40,000 seconds, about 11.1 hours. 500 times 1,000 times 8 gives 4,000,000 Mb, then divide by 100.
6 80%, from 6 kW down to 1.2 kW. 4.8 kW is saved, and 4.8 over 6 is 0.8.
7 On-premises is cheaper by $10,200. On-premises is 60,000 plus 81,000, or 141,000; cloud is 4,200 times 36, or 151,200.
8 You pay per request and execution time, and the platform adds or removes instances automatically. For a service that sits idle most of the day, serverless can cost more instead of less.
9 40,000 seconds. GB to Mb needs a factor of 8: 500 times 1,000 times 8 is 4,000,000.
10 24 GB. Storage counts in steps of 1,024, so agree on units before quoting a price.

04 What to do after marking

  • After marking, redo only the wrong items and write down which step went wrong (formula, unit, or misread number).
  • Repeat the same item two days later; move to the next paper only when both attempts are correct.
  • Parents only need the answer and note columns; there is no need to explain every item.

Download the full ten-item paper as a PDF, answers and notes included.Tutor Registration →

Questions and answers are written originally by the TutorZone team and are not taken from any school, publisher or examination authority paper. Every value is checked by computer.

Join as a tutor or coach — academic, music, sports, arts, STEM. Free to register. See how it works →