S6 ICT: project management and scheduling (basics)

S6 ICT: project management and scheduling (basics)

  • 2026-11-20

S6 ICT: project management and scheduling (basics)

Basics first: work breakdown, series and parallel durations, milestones, then the Gantt axis and the idea of float.

Basics: WBS, milestones and float This paper sorts out the terms and the arithmetic. A WBS splits the project into 4 phases of 3 work packages, 12 in all. Series tasks add their durations, so 3 plus 5 gives 8 days, while running them in parallel takes only the longer 5 days, or 5. A milestone has zero duration and acts as a checkpoint, so 4 phases carry 4 of them. Progress is a completion ratio, 9 over 12 giving 75.0 percent, and budget use is a spend ratio, 25,000 over 40,000 giving 62.5 percent with 15,000 remaining. It closes on the Gantt time axis, float arithmetic and the dependency error item.

01 Paper details (check answers afterwards)

Item Detail
Questions 10
Suggested time 25
Difficulty mix Foundation 3 · Intermediate 3 · Challenge 3 · Error redo 1
Chapter Chapter: S6 ICT: Project Management and Scheduling
Level Basics (10 items)

02 Questions (10 items)

  1. FoundationA work breakdown structure has 4 phases with 3 work packages in each. How many work packages are there in total?
  2. FoundationTask A takes 3 days and task B takes 5 days, and B must follow A. What is the shortest duration?
  3. FoundationIf tasks A and B can run in parallel, what is the shortest duration?
  4. IntermediateOne milestone closes each of the 4 phases. How many milestones are there?
  5. Intermediate9 of the 12 work packages are complete. What percentage is finished?
  6. IntermediateA project budget is 40,000 dollars and 25,000 has been spent. What share is used and how much remains?
  7. ChallengeWhat does the horizontal axis of a Gantt chart represent?
  8. ChallengeA task has an earliest start of day 2 and a latest start of day 5. What is its total float?
  9. ChallengeWhich path in the network diagram fixes the project duration?
  10. Error redoError item: a student claims that a Gantt chart cannot show dependencies between tasks. What is wrong?

03 Answers and one-line notes

# Answer One-line note
1 12. 4 times 3 gives 12; a work package is the lowest deliverable unit of the WBS.
2 8 days. A finish to start link adds the durations, so 3 plus 5 gives 8.
3 5 days. Parallel work takes the longer branch, which is 5 days.
4 4. A milestone has zero duration and marks a checkpoint rather than consuming time.
5 75.0 percent. 9 divided by 12 is 0.75, or 75.0 percent.
6 62.5 percent used, with 15,000 dollars remaining. 25000 over 40000 is 62.5 percent; the balance is 40000 minus 25000, or 15000.
7 Time. The vertical axis lists tasks and each bar length shows duration, so the horizontal axis is the time scale.
8 3 days. Total float is latest start minus earliest start, so 5 minus 2 gives 3.
9 The longest path, known as the critical path. Any one day slip on the critical path pushes the whole project back by one day.
10 Wrong. A Gantt chart can show finish to start links with arrows, though a network diagram reads better when links are complex. The student treats the chart as bare bars and ignores its arrows and milestone markers.

04 What to do after marking

  • After marking, redo only the wrong items and write down which step went wrong (formula, unit, or misread number).
  • Repeat the same item two days later; move to the next paper only when both attempts are correct.
  • Parents only need the answer and note columns; there is no need to explain every item.

Want every float value on the network diagram worked out cell by cell? Book a TutorZone tutor and unpack all ten items with the critical path in 25 minutes.Tutor Registration →

Questions and answers are written originally by the TutorZone team and are not taken from any school, publisher or examination authority paper. Every value is checked by computer.

Join as a tutor or coach — academic, music, sports, arts, STEM. Free to register. See how it works →