Second paper: RTO and RPO, the effect of a shorter MTTR, full versus incremental backup capacity, change requests and maintenance windows.
Intermediate: recovery targets and backup strategy Maintenance is scheduled with numbers. RTO says how soon service returns, RPO how much data may be lost, and they never substitute for each other. Cutting MTTR from six hours to three lifts availability from 99.70 to 99.85 percent at the same MTBF of 2,000 hours, usually more cheaply than stretching MTBF. Backup needs capacity maths: a 600 GB full plus 45 GB daily incrementals is 870 GB a week against 4,200 GB of nightly fulls, saving 3,330 GB. At 99.9 percent only 8.76 hours a year are available, and three windows of 2.5 hours use 7.5, leaving 1.26 for incidents.
01 Paper details (check answers afterwards)
| Item | Detail |
|---|---|
| Questions | 10 |
| Suggested time | 25 |
| Difficulty mix | Foundation 4 · Intermediate 2 · Challenge 2 · Error redo 2 |
| Chapter | Chapter: S6 ICT: System maintenance and documentation |
| Level | Intermediate (10 items) |
02 Questions (10 items)
- FoundationWhat do RTO and RPO mean?
- FoundationWith MTBF of 2,000 hours, cutting MTTR from 6 to 3 hours lifts availability from what to what?
- FoundationA 600 GB full plus 45 GB daily incrementals: how much does one week with a single full use, and how much does it save over nightly fulls?
- FoundationWhy must the last full backup exist before restoring incrementals?
- IntermediateOf 240 change requests a year with a sixty percent approval rate, how many get scheduled?
- IntermediateA 99.9 percent target allows 8.76 hours down a year; three maintenance windows of 2.5 hours each leave how much for incidents?
- ChallengeSixty servers need eight minutes each, five in parallel: how long in total?
- ChallengeWhat belongs in a release note?
- Error redoWhat is a baseline?
- Error redoWhat is technical debt, and why record it?
03 Answers and one-line notes
| # | Answer | One-line note |
|---|---|---|
| 1 | RTO is the recovery time objective, how long until service returns; RPO is the acceptable data loss, how much recent data may vanish. | RTO governs time and RPO governs data; write both into the recovery plan. |
| 2 | From 99.70 percent (2,000 over 2,006) to 99.85 percent (2,000 over 2,003). | Shortening recovery is usually cheaper than stretching time between failures. |
| 3 | The week uses 870 GB (600 plus six times 45); nightly fulls would need 4,200 GB, saving 3,330 GB. | Incrementals save space at the cost of a longer restore chain. |
| 4 | An incremental stores only differences from the previous backup; without the full as a base there is no complete data set. | Break the full backup chain and the whole restore plan must be rebuilt. |
| 5 | 144, from 240 times sixty percent; the other 96 are rejected or merged. | The approval rate feeds scheduling and capacity planning; it is not a gut feeling. |
| 6 | The windows consume 7.5 hours, leaving 1.26 hours for unplanned outages. | Planned downtime counts against availability too, so windows must leave headroom. |
| 7 | Work totals 480 minutes; five in parallel need 96 minutes, about one hour thirty-six minutes. | Parallelism sets the window length and therefore the exposure time. |
| 8 | Version number, date, additions and fixes, affected scope, deployment and rollback steps, and known issues. | The release note is the only handover record between maintainers and operators. |
| 9 | An approved, frozen, version-controlled set of documents and code; any later change must go through change control. | Only with a baseline can you separate a change from the current state. |
| 10 | Shortcut design taken to ship early, which charges interest later in slower changes and more defects; recording it makes repayment schedulable. | Unrecorded debt is hidden cost, collected in full during maintenance. |
04 What to do after marking
- After marking, redo only the wrong items and write down which step went wrong (formula, unit, or misread number).
- Repeat the same item two days later; move to the next paper only when both attempts are correct.
- Parents only need the answer and note columns; there is no need to explain every item.
Want the four maintenance types, availability and MTTR conversions, plus RTO, RPO, backup maths and documentation coverage all settled? Book a TutorZone tutor and work through every figure in twenty-five minutes.Tutor Registration →
Questions and answers are written originally by the TutorZone team and are not taken from any school, publisher or examination authority paper. Every value is checked by computer.