S6 ICT: system maintenance and documentation (error rework)

S6 ICT: system maintenance and documentation (error rework)

  • 2026-11-20

S6 ICT: system maintenance and documentation (error rework)

Error rework only: ten common confusions corrected item by item, including RTO read as RPO and 1.5.0 answered for 1.4.9.

Error rework: the ten commonest confusions This paper does one thing: correct the ideas that keep going wrong. Maintenance is not just bug fixing, since corrective work is 55 percent; perfective is not corrective; backup is not archiving; RTO controls time while RPO controls data; 1.4.9 is followed by 1.4.10 because versions are not decimals; an incremental restores only on top of the last full; heavy commenting is not documentation; a smaller MTTR raises availability; 99.9 percent is 8.76 hours a year, not 87.6; and testing never stops in maintenance, regression most of all.

01 Paper details (check answers afterwards)

Item Detail
Questions 10
Suggested time 25
Difficulty mix Foundation 4 · Intermediate 2 · Challenge 2 · Error redo 2
Chapter Chapter: S6 ICT: System maintenance and documentation
Level Error rework (10 items)

02 Questions (10 items)

  1. FoundationDoes system maintenance mean fixing bugs?
  2. FoundationIs perfective maintenance the same as corrective maintenance?
  3. FoundationAre backup and archiving the same thing?
  4. FoundationCan RTO and RPO be used interchangeably?
  5. IntermediateAfter 1.4.9, is the next bug-fix version 1.5.0?
  6. IntermediateCan an incremental backup be restored on its own?
  7. ChallengeDoes heavy code commenting mean documentation is complete?
  8. ChallengeDoes a larger MTTR raise availability?
  9. Error redoAt 99.9 percent availability, is yearly downtime 87.6 hours?
  10. Error redoOnce a system is in maintenance, is testing no longer needed?

03 Answers and one-line notes

# Answer One-line note
1 No. Corrective work is about 55 percent; adaptive, perfective and preventive work make up the other 45 percent. A team that only fixes bugs is eventually dragged down by environment change and efficiency problems.
2 No. Corrective maintenance repairs faults; perfective maintenance adds features or improves efficiency in a working system. Their purposes are opposite: one rescues, the other adds value.
3 No. Backup serves restore: short term, overwritable, drilled. Archiving serves retention and compliance: long term, read only, kept for a fixed period. Using backups as an archive means the evidence is overwritten when you need it.
4 No. RTO caps the time to restore service; RPO caps acceptable data loss. Confusing them produces a four-hour recovery that still loses half a day of data.
5 No, it is 1.4.10. Only a feature change bumps the middle digit to 1.5.0. Version numbers are not decimals; 1.4.10 follows 1.4.9.
6 No. Restore the last full backup first, then apply each incremental in order. A restore drill must test the whole chain, not just the full backup.
7 No. Comments explain code detail; documentation also needs architecture diagrams, a data dictionary, install and restore steps, and an operator manual. Comments serve the coder; documents serve the operator and maintainer.
8 No, the opposite. Availability equals MTBF over MTBF plus MTTR, so a smaller MTTR gives higher availability. Per point of availability, cutting MTTR is usually cheaper than stretching MTBF.
9 No. 8,760 times 0.1 percent is 8.76 hours; 87.6 hours corresponds to 99 percent. One misplaced decimal shifts the answer by a factor of ten.
10 No. Every change needs unit, integration and regression testing, and major changes still need user acceptance. Most maintenance incidents come from fixing one place and breaking another.

04 What to do after marking

  • After marking, redo only the wrong items and write down which step went wrong (formula, unit, or misread number).
  • Repeat the same item two days later; move to the next paper only when both attempts are correct.
  • Parents only need the answer and note columns; there is no need to explain every item.

Want the four maintenance types, availability and MTTR conversions, plus RTO, RPO, backup maths and documentation coverage all settled? Book a TutorZone tutor and work through every figure in twenty-five minutes.Tutor Registration →